If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0675080309000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.786553,"lon":-115.104448,"icon":""}]} |
Location: 00/09-03-067-08W5/0 | |
Location Alias: 00/09-03-67-08 W5M | |
Location Alias 2: 00/09-03-067-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 067 | |
Meridian: 5 | |
Range: 08 | |
Section: 03 | |
County/Municipality: Big Lakes County | |
Well Name: ASPENLEAF 10-11 HZ SWANH 9-3-67-8 | |
Operator Name: Aspenleaf Energy Limited | |
License Number: 0435660 | |
License Date: 2011-08-03 | |
License Status: Amended | |
Spud Date: 2011-08-31 | |
Final Drill Date: 2011-09-18 | |
Well Total Depth: 4008.00 m | |
Surface Hole Latitude: 54.786553 | |
Surface Hole Longitude: -115.104448 |
Date | Event |
---|---|
2011-08-03 | Obtained License |
2011-09-02 | Surface Casing Operation Performed |
2011-09-05 | Well Log Performed |
2011-09-06 | Direction Drilling Operation Performed - Horizontal |
2011-09-08 | Well Log Performed |
2011-09-09 | Intermediate Casing Operation Performed |
2011-09-18 | Finished Drilling |
2011-09-18 | Well Log Performed |
2011-09-18 | Well Mode changed to Drilled and Cased |
2011-09-19 | Well Log Performed |
2011-09-22 | Liner Casing Operation Performed |
2011-09-22 | Perforation Treatment Performed - Open-Hole Completion |
2011-09-23 | Well Log Performed |
2011-09-24 | Rig Released |
2012-01-01 | Well Began Production |
2012-01-01 | Well Fluid changed to Crude Oil |
2012-01-01 | Well Mode changed to Pumping |
2012-01-08 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-06 | 1980.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-22 | Open Hole/Barefoot Completion | 4003.30 | 4008.00 | 0 |
2012-01-08 | Multi-Stage Fracture | 3386.50 | 3387.30 | 0 |
2012-01-08 | Multi-Stage Fracture | 3313.00 | 3313.80 | 0 |
2012-01-08 | Multi-Stage Fracture | 3239.40 | 3240.20 | 0 |
2012-01-08 | Multi-Stage Fracture | 3165.80 | 3166.60 | 0 |
2012-01-08 | Multi-Stage Fracture | 3092.30 | 3093.10 | 0 |
2012-01-08 | Multi-Stage Fracture | 3007.60 | 3008.40 | 0 |
2012-01-08 | Multi-Stage Fracture | 2933.80 | 2934.60 | 0 |
2012-01-08 | Multi-Stage Fracture | 2860.60 | 2861.40 | 0 |
2012-01-08 | Multi-Stage Fracture | 2787.30 | 2788.10 | 0 |
2012-01-08 | Multi-Stage Fracture | 2713.60 | 2714.40 | 0 |
2012-01-08 | Multi-Stage Fracture | 3994.30 | 3995.20 | 0 |
2012-01-08 | Multi-Stage Fracture | 2640.30 | 2641.10 | 0 |
2012-01-08 | Multi-Stage Fracture | 2554.70 | 2555.50 | 0 |
2012-01-08 | Multi-Stage Fracture | 2480.70 | 2481.50 | 0 |
2012-01-08 | Multi-Stage Fracture | 2407.00 | 2407.80 | 0 |
2012-01-08 | Multi-Stage Fracture | 3925.30 | 3926.10 | 0 |
2012-01-08 | Multi-Stage Fracture | 3840.00 | 3840.80 | 0 |
2012-01-08 | Multi-Stage Fracture | 3766.70 | 3767.50 | 0 |
2012-01-08 | Multi-Stage Fracture | 3693.80 | 3694.60 | 0 |
2012-01-08 | Multi-Stage Fracture | 3619.70 | 3620.50 | 0 |
2012-01-08 | Multi-Stage Fracture | 3545.60 | 3546.40 | 0 |
2012-01-08 | Multi-Stage Fracture | 3471.70 | 3472.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7693 | 0.0 | 0.0 | 0.0 |
2013 | 8536 | 0.0 | 0.0 | 0.0 |
2014 | 8482 | 0.0 | 0.0 | 0.0 |
2015 | 7765 | 0.0 | 0.0 | 0.0 |
2016 | 8141 | 0.0 | 0.0 | 0.0 |
2017 | 8542 | 0.0 | 0.0 | 0.0 |
2018 | 7582 | 0.0 | 0.0 | 0.0 |
2019 | 7867 | 0.0 | 0.0 | 0.0 |
2020 | 2030 | 0.0 | 0.0 | 0.0 |
For data sources see[6]