If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0675083314000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.832541,"lon":-115.14949,"icon":""}]} |
Location: 00/14-33-067-08W5/0 | |
Location Alias: 00/14-33-67-08 W5M | |
Location Alias 2: 00/14-33-067-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 067 | |
Meridian: 5 | |
Range: 08 | |
Section: 33 | |
County/Municipality: Big Lakes County | |
Well Name: ASPENLEAF 16-28 HZ SWANH 14-33-67-8 | |
Operator Name: Aspenleaf Energy Limited | |
License Number: 0435687 | |
License Date: 2011-08-03 | |
License Status: Issued | |
Spud Date: 2011-10-18 | |
Final Drill Date: 2011-11-01 | |
Well Total Depth: 4010.00 m | |
Surface Hole Latitude: 54.832541 | |
Surface Hole Longitude: -115.149490 |
Date | Event |
---|---|
2011-08-03 | Obtained License |
2011-10-19 | Surface Casing Operation Performed |
2011-10-23 | Direction Drilling Operation Performed - Horizontal |
2011-10-26 | Intermediate Casing Operation Performed |
2011-11-01 | Finished Drilling |
2011-11-01 | Well Log Performed |
2011-11-01 | Well Mode changed to Drilled and Cased |
2011-11-04 | Liner Casing Operation Performed |
2011-11-04 | Perforation Treatment Performed - Open-Hole Completion |
2011-11-05 | Rig Released |
2011-11-05 | Well Log Performed |
2011-11-07 | Well Log Performed |
2011-11-25 | Well Began Production |
2011-11-25 | Well Fluid changed to Crude Oil |
2011-11-25 | Well Mode changed to Pumping |
2011-12-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-12-20 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-10-23 | 1988.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-04 | Open Hole/Barefoot Completion | 3600.00 | 4010.00 | 0 |
2011-12-20 | Multi-Stage Fracture | 3165.30 | 3166.40 | 0 |
2011-12-20 | Multi-Stage Fracture | 3112.90 | 3113.70 | 0 |
2011-12-20 | Multi-Stage Fracture | 3060.80 | 3061.90 | 0 |
2011-12-20 | Multi-Stage Fracture | 3007.60 | 3008.40 | 0 |
2011-12-20 | Multi-Stage Fracture | 2954.90 | 2956.10 | 0 |
2011-12-20 | Multi-Stage Fracture | 2902.00 | 2902.80 | 0 |
2011-12-20 | Multi-Stage Fracture | 2849.90 | 2851.00 | 0 |
2011-12-20 | Multi-Stage Fracture | 2797.00 | 2797.80 | 0 |
2011-12-20 | Multi-Stage Fracture | 2744.70 | 2745.90 | 0 |
2011-12-20 | Multi-Stage Fracture | 2691.40 | 2692.20 | 0 |
2011-12-19 | Multi-Stage Fracture | 3579.70 | 3581.00 | 0 |
2011-12-20 | Multi-Stage Fracture | 2639.20 | 2640.30 | 0 |
2011-12-20 | Multi-Stage Fracture | 2586.00 | 2586.80 | 0 |
2011-12-20 | Multi-Stage Fracture | 2533.40 | 2534.50 | 0 |
2011-12-20 | Multi-Stage Fracture | 2480.30 | 2481.10 | 0 |
2011-12-20 | Multi-Stage Fracture | 2429.40 | 2430.20 | 0 |
2011-12-19 | Multi-Stage Fracture | 3521.60 | 3522.40 | 0 |
2011-12-19 | Multi-Stage Fracture | 3481.50 | 3482.70 | 0 |
2011-12-19 | Multi-Stage Fracture | 3248.50 | 3429.30 | 0 |
2011-12-20 | Multi-Stage Fracture | 3376.40 | 3377.60 | 0 |
2011-12-20 | Multi-Stage Fracture | 3323.20 | 3324.00 | 0 |
2011-12-20 | Multi-Stage Fracture | 3270.90 | 3272.00 | 0 |
2011-12-20 | Multi-Stage Fracture | 3217.70 | 3218.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 344 | 0.0 | 0.0 | 0.0 |
2012 | 7173 | 0.0 | 0.0 | 0.0 |
2013 | 8257 | 0.0 | 0.0 | 0.0 |
2014 | 8008 | 0.0 | 0.0 | 0.0 |
2015 | 8340 | 0.0 | 0.0 | 0.0 |
2016 | 8541 | 0.0 | 0.0 | 0.0 |
2017 | 8410 | 0.0 | 0.0 | 0.0 |
2018 | 5043 | 0.0 | 0.0 | 0.0 |
2019 | 7556 | 0.0 | 0.0 | 0.0 |
2020 | 1888 | 0.0 | 0.0 | 0.0 |
For data sources see[6]