X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494253014000

Well Details

Well ID: 0494253014000
Loading map...
Location: 00/14-30-049-25W4/0
Location Alias: 00/14-30-49-25 W4M
Location Alias 2: 00/14-30-049-25 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 25
Section: 30
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 14-30-49-25
Operator Name: NEP Canada ULC
License Number: 0006298
License Date: 1953-04-09
License Status: Issued
Spud Date: 1953-04-30
Final Drill Date: 1953-05-24
Well Total Depth: 1634.30 m
Surface Hole Latitude: 53.263278
Surface Hole Longitude: -113.649947

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-04-09 Obtained License
1953-05-10 Drill Stem Test Performed
1953-05-15 Drill Stem Test Performed
1953-05-16 Drill Stem Test Performed
1953-05-19 Liner Casing Operation Performed
1953-05-23 Drill Stem Test Performed
1953-05-24 Finished Drilling
1953-05-24 Well Mode changed to Drilled and Cased
1953-05-26 Perforation Treatment Performed - Jet Perforation
1953-05-30 Well Began Production
1953-05-30 Well Fluid changed to Crude Oil
1953-05-30 Well Mode changed to Flowing
1954-12-21 Perforation Treatment Performed - Jet Perforation
1955-08-01 Well Fluid changed to Crude Oil
1955-08-01 Well Mode changed to Flowing
1963-01-23 Well Fluid changed to Crude Oil
1963-01-23 Well Mode changed to Flowing
1975-10-01 Perforation Treatment Performed - Cement Squeeze
1975-10-08 Perforation Treatment Performed - Jet Perforation
1975-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-12-15 Perforation Treatment Performed - Cement Squeeze
1979-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-01-09 Perforation Treatment Performed - Jet Perforation
1979-01-10 Well Fluid changed to Crude Oil
1979-01-10 Well Mode changed to Pumping
1989-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-03-29 Perforation Treatment Performed - Cement Squeeze
1989-03-29 Well Log Performed
1989-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-03-31 Perforation Treatment Performed - Jet Perforation
1996-03-26 Well Log Performed
1996-03-27 Perforation Treatment Performed - Cement Squeeze
1996-03-29 Perforation Treatment Performed - Jet Perforation
1996-03-29 Well Log Performed
1996-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-05-01 Well Fluid changed to Crude Oil
1997-05-01 Well Mode changed to Suspended
1997-08-06 Well Log Performed
1997-08-07 Well Fluid changed to Crude Oil
1997-08-07 Well Log Performed
1997-08-07 Well Mode changed to Pumping
1997-09-01 Well Fluid changed to Gas
1997-09-01 Well Mode changed to Flowing
1998-03-25 Perforation Treatment Performed - Cement Squeeze
1998-03-25 Plug Back Performed
1998-03-26 Perforation Treatment Performed - Jet Perforation
1998-03-26 Well Log Performed
1998-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-05-22 Well Log Performed
1998-05-23 Perforation Treatment Performed - Cement Squeeze
1998-05-23 Plug Back Performed
1998-05-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-05-24 Perforation Treatment Performed - Jet Perforation
1998-05-24 Well Log Performed
1998-10-01 Well Fluid changed to Gas
1998-10-01 Well Mode changed to Suspended
1999-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-03 Plug Back Performed
1999-11-04 Perforation Treatment Performed - Jet Perforation
2003-01-07 Perforation Treatment Performed - Cement Squeeze
2003-01-07 Plug Back Performed
2003-01-09 Perforation Treatment Performed - Jet Perforation
2003-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-05-23 Well Fluid changed to Crude Oil
2003-05-23 Well Mode changed to Flowing
2006-11-01 Well Fluid changed to Crude Oil
2006-11-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-05-26 Perforation 1627.30 1628.90 13
1989-03-29 Cement Squeeze 1623.10 1623.40 0
1989-03-31 Perforation 1620.10 1620.40 13
1989-03-31 Acid Treatment 1620.10 1620.40 0
1996-03-27 Cement Squeeze 1620.10 1620.40 0
1996-03-29 Perforation 1615.20 1615.50 13
1996-04-11 Acid Treatment 1615.20 1615.50 0
1998-03-25 Cement Squeeze 1615.20 1615.50 0
1998-03-26 Perforation 1596.00 1597.00 13
1998-03-27 Acid Treatment 1596.00 1597.00 0
1998-05-23 Cement Squeeze 1596.00 1597.00 0
1954-12-21 Perforation 1595.60 1598.70 13
1998-05-24 Perforation 1591.00 1592.00 18
1998-05-24 Acid Treatment 1591.00 1592.00 0
1999-11-03 Packing Device Capped w/Cement 1572.00 1580.00 0
1999-11-04 Perforation 1331.00 1333.50 17
2003-01-07 Cement Squeeze 1331.00 1333.50 0
2003-01-09 Perforation 1591.00 1592.00 17
2003-01-13 Acid Treatment 1591.00 1592.00 0
1975-10-01 Cement Squeeze 1595.60 1628.90 0
1975-10-08 Perforation 1624.00 1624.60 7
1975-10-09 Acid Treatment 1624.00 1624.60 0
1978-12-15 Cement Squeeze 1595.60 1624.60 0
1979-01-09 Perforation 1623.10 1623.40 7
1979-01-09 Acid Treatment 1623.10 1623.40 0
1989-03-28 Acid Treatment 1623.10 1623.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1970 3341 0.0 0.0 0.0
1971 2380 0.0 0.0 0.0
1972 3589 0.0 0.0 0.0
1973 7868 0.0 0.0 0.0
1974 8373 0.0 0.0 0.0
1975 6256 0.0 0.0 0.0
1976 8492 0.0 0.0 0.0
1977 8515 0.0 0.0 0.0
1978 7725 0.0 0.0 0.0
1979 7776 0.0 0.0 0.0
1980 8458 0.0 0.0 0.0
1981 8603 0.0 0.0 0.0
1982 7795 0.0 0.0 0.0
1983 8234 0.0 0.0 0.0
1984 8273 0.0 0.0 0.0
1985 8111 0.0 0.0 0.0
1986 7843 0.0 0.0 0.0
1987 8134 0.0 0.0 0.0
1988 7117 0.0 0.0 0.0
1989 6367 0.0 0.0 0.0
1990 8405 0.0 0.0 0.0
1991 8454 0.0 0.0 0.0
1992 8208 0.0 0.0 0.0
1993 8089 0.0 0.0 0.0
1994 8597 0.0 0.0 0.0
1995 8373 0.0 0.0 0.0
1996 4162 0.0 0.0 0.0
1997 5514 0.0 0.0 0.0
1998 5145 0.0 0.0 0.0
2003 5261 0.0 0.0 0.0
2004 8337 0.0 0.0 0.0
2005 8583 0.0 0.0 0.0
2006 7432 0.0 0.0 0.0
2007 8542 0.0 0.0 0.0
2008 8424 0.0 0.0 0.0
2009 8457 0.0 0.0 0.0
2010 8156 0.0 0.0 0.0
2011 8413 0.0 0.0 0.0
2012 8476 0.0 0.0 0.0
2013 8503 0.0 0.0 0.0
2014 6576 0.0 0.0 0.0
2015 7366 0.0 0.0 0.0
2016 5723 0.0 0.0 0.0
2017 5969 0.0 0.0 0.0
2018 8438 0.0 0.0 0.0
2019 8277 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References