X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494263511000

Well Details

Well ID: 0494263511000
Loading map...
Location: 00/11-35-049-26W4/0
Location Alias: 00/11-35-49-26 W4M
Location Alias 2: 00/11-35-049-26 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 26
Section: 35
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 11-35-49-26
Operator Name: NEP Canada ULC
License Number: 0004355
License Date: 1952-03-13
License Status: Issued
Spud Date: 1952-04-03
Final Drill Date: 1952-04-28
Well Total Depth: 1751.00 m
Surface Hole Latitude: 53.274089
Surface Hole Longitude: -113.698700

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-03-13 Obtained License
1952-04-24 Drill Stem Test Performed
1952-04-25 Drill Stem Test Performed
1952-04-28 Finished Drilling
1952-04-28 Production Casing Operation Performed
1952-04-28 Well Mode changed to Drilled and Cased
1952-05-01 Perforation Treatment Performed - Open-Hole Completion
1952-07-22 Well Began Production
1952-07-22 Well Fluid changed to Crude Oil
1952-07-22 Well Mode changed to Flowing
1959-12-10 Well Fluid changed to Crude Oil
1959-12-10 Well Mode changed to Pumping
1979-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-03-15 Perforation Treatment Performed - Cement Plug
1979-03-15 Perforation Treatment Performed - Open-Hole Completion
1979-03-16 Perforation Treatment Performed - Jet Perforation
1979-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-21 Well Fluid changed to Crude Oil
1984-02-21 Well Mode changed to Suspended
1988-05-19 Well Log Performed
1988-05-23 Perforation Treatment Performed - Open-Hole Completion
1988-05-31 Liner Casing Operation Performed
1988-05-31 Perforation Treatment Performed - Cement Squeeze
1988-06-03 Well Log Performed
1988-06-05 Perforation Treatment Performed - Jet Perforation
1988-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-18 Well Began Injection
1988-07-18 Well Fluid changed to Water
1988-07-18 Well Type changed to Injection
1990-11-08 Well Fluid changed to Water
1990-11-08 Well Mode changed to Suspended
1990-11-08 Well Type changed to Injection
1995-04-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-04-20 Plug Back Performed
1995-04-20 Well Fluid changed to Water
1995-04-20 Well Log Performed
1995-04-20 Well Mode changed to Abandoned Zone
1995-04-20 Well Type changed to Injection
1995-04-22 Perforation Treatment Performed - Jet Perforation
1995-04-22 Well Log Performed
1995-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-10-26 Perforation Treatment Performed - Jet Perforation
2012-10-26 Well Log Performed
2012-10-28 Perforation Treatment Performed - Fractured
2013-12-05 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-05-01 Open Hole/Barefoot Completion 1618.50 1643.80 0
1988-06-06 Acid Treatment 1720.00 1740.00 0
1995-04-20 Packing Device Capped w/Cement 1699.70 1707.70 0
1995-04-22 Perforation 1559.50 1563.00 13
1995-04-22 Perforation 1564.50 1570.20 13
1995-04-22 Perforation 1571.20 1574.00 13
1995-04-23 Acid Treatment 1559.50 1574.00 0
2012-10-26 Perforation 1547.00 1549.00 20
2012-10-26 Perforation 1542.00 1544.00 20
2012-10-28 Fracture 1542.00 1544.00 0
2012-10-28 Fracture 1547.00 1549.00 0
1979-03-14 Acid Treatment 1618.50 1643.80 0
2013-12-05 Chemical Squeeze 1542.00 1574.00 0
1979-03-15 Cement Plug 1638.90 1643.80 0
1979-03-15 Open Hole/Barefoot Completion 1618.50 1638.90 0
1979-03-16 Perforation 1638.60 1638.90 10
1979-03-19 Acid Treatment 1618.50 1638.90 0
1988-05-23 Open Hole/Barefoot Completion 1638.90 1751.00 0
1988-05-31 Cement Squeeze 1618.50 1751.00 0
1988-06-05 Perforation 1720.00 1740.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1973 2712 0.0 0.0 0.0
1974 8544 0.0 0.0 0.0
1975 8559 0.0 0.0 0.0
1976 8371 0.0 0.0 0.0
1977 3416 0.0 0.0 0.0
1979 1140 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-03 No Incident Encountered 0.00 0.00
2013-12-05 No Incident Encountered 0.00 0.00

For data sources see[6]

References