X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494263603000

Well Details

Well ID: 0494263603000
Loading map...
Location: 00/03-36-049-26W4/0
Location Alias: 00/03-36-49-26 W4M
Location Alias 2: 00/03-36-049-26 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 26
Section: 36
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 3-36-49-26
Operator Name: NEP Canada ULC
License Number: 0006618
License Date: 1953-06-20
License Status: Suspension
Spud Date: 1953-07-27
Final Drill Date: 1953-08-15
Well Total Depth: 1645.00 m
Surface Hole Latitude: 53.266862
Surface Hole Longitude: -113.674268

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-06-20 Obtained License
1953-08-15 Finished Drilling
1953-08-15 Well Mode changed to Drilled and Cased
1953-08-16 Liner Casing Operation Performed
1953-08-21 Perforation Treatment Performed - Jet Perforation
1953-08-24 Well Began Production
1953-08-24 Well Fluid changed to Crude Oil
1953-08-24 Well Mode changed to Flowing
1974-05-29 Well Fluid changed to Crude Oil
1974-05-29 Well Mode changed to Pumping
1975-01-21 Perforation Treatment Performed - Cement Squeeze
1975-03-12 Perforation Treatment Performed - Jet Perforation
1975-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-16 Perforation Treatment Performed - Cement Squeeze
1978-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-17 Perforation Treatment Performed - Jet Perforation
1994-08-18 Perforation Treatment Performed - Cement Squeeze
1994-09-17 Well Log Performed
1994-09-19 Perforation Treatment Performed - Jet Perforation
1994-09-19 Well Log Performed
1994-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-15 Well Fluid changed to Crude Oil
1997-02-15 Well Mode changed to Suspended
1997-09-10 Well Fluid changed to Crude Oil
1997-09-10 Well Mode changed to Pumping
1997-10-01 Well Fluid changed to Crude Oil
1997-10-01 Well Mode changed to Suspended
1997-10-20 Well Log Performed
1997-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-10-21 Plug Back Performed
1997-10-21 Well Fluid changed to Crude Oil
1997-10-21 Well Log Performed
1997-10-21 Well Mode changed to Abandoned Zone
1997-10-22 Perforation Treatment Performed - Jet Perforation
2001-08-04 Perforation Treatment Performed - Cement Squeeze
2001-08-04 Plug Back Performed
2001-08-10 Well Log Performed
2001-08-12 Perforation Treatment Performed - Jet Perforation
2001-08-12 Well Log Performed
2001-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-08-21 Perforation Treatment Performed - Jet Perforation
2001-08-21 Well Log Performed
2001-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-08-29 Perforation Treatment Performed - Cement Squeeze
2001-08-29 Plug Back Performed
2001-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-30 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-08-21 Perforation 1639.80 1641.30 13
1994-09-19 Perforation 1631.90 1632.40 13
1994-09-20 Acid Treatment 1631.90 1632.40 0
1997-10-21 Packing Device Capped w/Cement 1607.00 1615.00 0
1997-10-22 Perforation 1106.00 1108.00 18
2001-08-04 Cement Squeeze 1106.00 1108.00 0
2001-08-12 Perforation 1413.10 1415.50 17
2001-08-15 Acid Treatment 1413.10 1415.50 0
2001-08-21 Perforation 1432.00 1438.00 17
2001-08-23 Acid Treatment 1432.00 1438.00 0
2001-08-29 Cement Squeeze 1413.10 1415.50 0
1975-01-21 Cement Squeeze 1639.80 1641.30 0
2001-08-29 Cement Squeeze 1432.00 1438.00 0
2001-08-30 Packing Device Capped w/Cement 652.00 662.00 0
1975-03-12 Perforation 1638.00 1638.90 7
1975-03-13 Acid Treatment 1638.00 1638.90 0
1978-10-16 Acid Treatment 1638.00 1638.90 0
1978-10-16 Cement Squeeze 1638.00 1638.90 0
1978-10-17 Perforation 1635.90 1636.20 7
1978-10-17 Acid Treatment 1635.90 1636.20 0
1994-08-18 Cement Squeeze 1635.90 1636.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1970 644 0.0 0.0 0.0
1971 2598 0.0 0.0 0.0
1972 4329 0.0 0.0 0.0
1973 7775 0.0 0.0 0.0
1974 7251 0.0 0.0 0.0
1975 6503 0.0 0.0 0.0
1976 7826 0.0 0.0 0.0
1977 8012 0.0 0.0 0.0
1978 8160 0.0 0.0 0.0
1979 8266 0.0 0.0 0.0
1980 8438 0.0 0.0 0.0
1981 8627 0.0 0.0 0.0
1982 8587 0.0 0.0 0.0
1983 8380 0.0 0.0 0.0
1984 8553 0.0 0.0 0.0
1985 8423 0.0 0.0 0.0
1986 8151 0.0 0.0 0.0
1987 8509 0.0 0.0 0.0
1988 8463 0.0 0.0 0.0
1989 8252 0.0 0.0 0.0
1990 8677 0.0 0.0 0.0
1991 8451 0.0 0.0 0.0
1992 7770 0.0 0.0 0.0
1993 8379 0.0 0.0 0.0
1994 5204 0.0 0.0 0.0
1995 8708 0.0 0.0 0.0
1996 8542 0.0 0.0 0.0
1997 991 0.0 0.0 0.0

For data sources see[5]

References