X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584053008002

Well Details

Well ID: 0584053008002
Loading map...
Location: 00/08-30-058-05W4/2
Location Alias: 00/08-30-58-05 W4M
Location Alias 2: 00/08-30-058-05 W4/02
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 05
Section: 30
County/Municipality: County of St. Paul No. 19
Well Name: HADRIAN LINBERGH 8-30-58-5
Operator Name: Zargon Oil & Gas Ltd.
License Number: 0229549
License Date: 1999-12-02
License Status: Suspension
Spud Date: 1999-12-06
Final Drill Date: 1999-12-08
Well Total Depth: 608.00 m
Surface Hole Latitude: 54.038889
Surface Hole Longitude: -110.726192

For data sources see[1][2]

Well History

Date Event
1999-12-02 Obtained License
1999-12-07 Surface Casing Operation Performed
1999-12-08 Finished Drilling
1999-12-08 Well Log Performed
1999-12-08 Well Mode changed to Drilled and Cased
1999-12-09 Drill Stem Test Performed
1999-12-10 Drill Stem Test Performed
1999-12-10 Production Casing Operation Performed
1999-12-10 Rig Released
1999-12-15 Perforation Treatment Performed - Jet Perforation
1999-12-15 Well Log Performed
1999-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-12-16 Perforation Treatment Performed - Jet Perforation
1999-12-16 Plug Back Performed
1999-12-16 Well Log Performed
1999-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-12-17 Perforation Treatment Performed - Jet Perforation
1999-12-17 Plug Back Performed
1999-12-17 Well Log Performed
1999-12-22 Perforation Treatment Performed - Jet Perforation
1999-12-22 Well Log Performed
1999-12-28 Perforation Treatment Performed - Jet Perforation
1999-12-28 Well Log Performed
1999-12-28 Well Mode changed to Drilled and Cased
2000-01-17 Well Log Performed
2000-01-19 Well Log Performed
2000-05-03 Well Began Production
2000-05-03 Well Fluid changed to Gas
2000-05-03 Well Mode changed to Flowing
2010-02-01 Well Fluid changed to Gas
2010-02-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-12-15 Perforation 579.50 580.50 14
1999-12-16 Packing Device Capped w/Cement 562.00 570.00 0
1999-12-16 Perforation 541.50 544.00 14
1999-12-17 Packing Device Capped w/Cement 537.50 540.50 0
1999-12-17 Perforation 535.50 536.50 14
1999-12-22 Perforation 535.00 536.50 14
1999-12-28 Perforation 521.50 522.50 13
1999-12-28 Perforation 518.50 519.50 13
1999-12-28 Perforation 513.30 515.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 5666 0.0 0.0 0.0
2001 7780 0.0 0.0 0.0
2002 8615 0.0 0.0 0.0
2003 8434 0.0 0.0 0.0
2004 8728 0.0 0.0 0.0
2005 8476 0.0 0.0 0.0
2006 7109 0.0 0.0 0.0
2007 8493 0.0 0.0 0.0
2008 1904 0.0 0.0 0.0
2009 7807 0.0 0.0 0.0
2010 377 0.0 0.0 0.0

For data sources see[5]

References