X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495041816020

Well Details

Well ID: 0495041816020
Loading map...
Location: 02/16-18-049-04W5/0
Location Alias: 02/16-18-49-04 W5M
Location Alias 2: 02/16-18-049-04 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 04
Section: 18
County/Municipality: Brazeau County
Well Name: GEI ET AL PEMBINA 16-18-49-4
Operator Name: Lightstream Resources Ltd.
License Number: 0109101
License Date: 1984-09-04
License Status: Re-Entered
Spud Date: 1984-09-19
Final Drill Date: 1984-09-28
Well Total Depth: 1835.00 m
Surface Hole Latitude: 53.233009
Surface Hole Longitude: -114.567838

For data sources see[1][2]

Well History

Date Event
1984-09-04 Obtained License
1984-09-20 Surface Casing Operation Performed
1984-09-28 Finished Drilling
1984-09-28 Well Log Performed
1984-09-29 Drill Stem Test Performed
1984-09-30 Drill Stem Test Performed
1984-10-01 Drill Stem Test Performed
1984-10-03 Production Casing Operation Performed
1984-10-03 Rig Released
1985-01-12 Well Log Performed
1985-01-14 Well Log Performed
1985-01-15 Perforation Treatment Performed - Jet Perforation
1985-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-01-24 Perforation Treatment Performed - Cement Squeeze
1985-01-25 Perforation Treatment Performed - Cement Squeeze
1985-01-31 Perforation Treatment Performed - Jet Perforation
1985-01-31 Well Log Performed
1985-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-13 Well Log Performed
1985-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-02-14 Perforation Treatment Performed - Jet Perforation
1985-02-14 Plug Back Performed
1985-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-19 Well Mode changed to Drilled and Cased
1990-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-07-11 Plug Back Performed
1990-07-11 Well Mode changed to Abandoned
1990-07-12 Well Mode changed to Abandoned and Re-entered
1990-07-13 Well Abandoned
1996-11-30 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-01-15 Perforation 1785.00 1787.20 13
1985-02-14 Perforation 1770.00 1772.00 13
1985-02-15 Acid Treatment 1770.00 1772.00 0
1990-07-11 Packing Device Capped w/Cement 1757.00 1765.00 0
1985-01-15 Perforation 1788.50 1791.00 13
1985-01-17 Acid Treatment 1785.00 1791.00 0
1985-01-24 Cement Squeeze 1788.50 1791.00 0
1985-01-25 Cement Squeeze 1785.00 1787.20 0
1985-01-31 Perforation 1784.50 1786.20 13
1985-02-03 Acid Treatment 1784.50 1786.20 0
1985-02-06 Acid Treatment 1784.50 1786.20 0
1985-02-14 Packing Device Capped w/Cement 1781.70 1781.70 0

For data sources see[4]



References