X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0215052110000

Well Details

Well ID: 0215052110000
Loading map...
Location: 00/10-21-021-05W5/0
Location Alias: 00/10-21-21-05 W5M
Location Alias 2: 00/10-21-021-05 W5/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 5
Range: 05
Section: 21
County/Municipality: Kananaskis Improvement District
Well Name: CALEDONIANMID QUIRK CK 10-21-21-5
Operator Name: Caledonian Midstream Corporation
License Number: 0048972
License Date: 1974-02-12
License Status: Issued
Spud Date: 1975-03-21
Final Drill Date: 1975-09-09
Well Total Depth: 3592.10 m
Surface Hole Latitude: 50.795505
Surface Hole Longitude: -114.637529

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-02-12 Obtained License
1975-03-21 Lost Circulation Occurred
1975-06-11 Drill Stem Test Performed
1975-08-26 Well Log Performed
1975-09-09 Finished Drilling
1975-09-12 Production Casing Operation Performed
1975-10-10 Perforation Treatment Performed - Jet Perforation
1975-10-11 Perforation Treatment Performed - Jet Perforation
1975-10-17 Perforation Treatment Performed - Fractured
1975-11-08 Perforation Treatment Performed - Jet Perforation
1975-11-09 Perforation Treatment Performed - Jet Perforation
1975-11-11 Perforation Treatment Performed - Jet Perforation
1975-12-18 Perforation Treatment Performed - Fractured
1976-02-05 Well Mode changed to Drilled and Cased
1976-10-19 Well Began Production
1976-10-19 Well Fluid changed to Gas
1976-10-19 Well Mode changed to Pumping
2013-07-26 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-10-10 Perforation 2999.20 3009.00 3
1975-11-11 Perforation 2819.40 2822.40 3
1975-11-11 Perforation 2828.50 2831.60 3
1975-11-11 Perforation 2856.60 2862.10 3
1975-11-11 Perforation 2871.20 2882.80 3
1975-11-11 Perforation 2887.10 2895.60 3
1975-12-18 Fracture 2819.40 2920.00 0
1975-10-10 Perforation 3012.00 3019.00 3
1975-10-10 Perforation 3027.90 3032.80 3
1975-10-11 Perforation 2967.20 2974.80 3
1975-10-11 Perforation 2979.70 2989.50 3
1975-10-17 Fracture 2967.20 3032.80 0
1975-11-08 Perforation 2911.40 2920.00 3
1975-11-09 Perforation 2895.60 2898.60 3
1975-11-09 Perforation 2903.20 2910.80 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 648 0.0 0.0 0.0
1977 2652 0.0 0.0 0.0
1978 6328 0.0 0.0 0.0
1979 7133 0.0 0.0 0.0
1980 6215 0.0 0.0 0.0
1981 5107 0.0 0.0 0.0
1982 5101 0.0 0.0 0.0
1983 2128 0.0 0.0 0.0
1984 2592 0.0 0.0 0.0
1985 3961 0.0 0.0 0.0
1986 3844 0.0 0.0 0.0
1987 2836 0.0 0.0 0.0
1988 7364 0.0 0.0 0.0
1989 8091 0.0 0.0 0.0
1990 8499 0.0 0.0 0.0
1991 4457 0.0 0.0 0.0
1992 6283 0.0 0.0 0.0
1993 2631 0.0 0.0 0.0
1994 972 0.0 0.0 0.0
1995 1133 0.0 0.0 0.0
1996 6318 0.0 0.0 0.0
1997 8194 0.0 0.0 0.0
1998 7976 0.0 0.0 0.0
1999 4793 0.0 0.0 0.0
2000 6842 0.0 0.0 0.0
2001 5011 0.0 0.0 0.0
2002 6349 0.0 0.0 0.0
2003 5280 0.0 0.0 0.0
2004 3373 0.0 0.0 0.0
2005 3813 0.0 0.0 0.0
2006 4836 0.0 0.0 0.0
2007 1440 0.0 0.0 0.0
2008 1044 0.0 0.0 0.0
2009 1661 0.0 0.0 0.0
2010 891 0.0 0.0 0.0
2014 2448 0.0 0.0 0.0
2015 4229 0.0 0.0 0.0
2016 1090 0.0 0.0 0.0
2017 1509 0.0 0.0 0.0
2018 5160 0.0 0.0 0.0
2019 6002 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1975-03-21 Lost Circulation 137.20 137.20
1975-12-14 No Incident Encountered 0.00 0.00

For data sources see[6]

References