X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224080406000

Well Details

Well ID: 0224080406000
Loading map...
Location: 00/06-04-022-08W4/0
Location Alias: 00/06-04-22-08 W4M
Location Alias 2: 00/06-04-022-08 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 08
Section: 04
County/Municipality: Special Areas No. 2
Well Name: RIMOIL ET AL ATLEE 6-4-22-8
Operator Name: Lightstream Resources Ltd.
License Number: 0055660
License Date: 1975-11-03
License Status: RecCertified
Spud Date: 1975-11-14
Final Drill Date: 1975-11-14
Well Total Depth: 466.30 m
Surface Hole Latitude: 50.841267
Surface Hole Longitude: -111.055490

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-11-03 Obtained License
1975-11-14 Finished Drilling
1975-11-14 Well Mode changed to Drilled and Cased
1975-11-15 Production Casing Operation Performed
1975-11-23 Perforation Treatment Performed - Bullet Perforation
1975-11-23 Perforation Treatment Performed - Selective Bullet Perforations
1975-11-26 Perforation Treatment Performed - Fractured
1976-08-12 Well Began Production
1976-08-12 Well Fluid changed to Gas
1976-08-12 Well Mode changed to Flowing
1991-10-31 Well Fluid changed to Gas
1991-10-31 Well Mode changed to Suspended
1992-05-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-05-26 Plug Back Performed
1992-05-26 Well Fluid changed to Gas
1992-05-26 Well Mode changed to Abandoned
1992-07-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-11-23 Selective Bullet Perforations 366.10 366.40 0
1992-05-26 Packing Device Capped w/Cement 355.00 363.00 0
1975-11-23 Selective Bullet Perforations 366.70 398.10 0
1975-11-23 Selective Bullet Perforations 404.80 405.10 0
1975-11-23 Selective Bullet Perforations 405.10 405.40 0
1975-11-23 Selective Bullet Perforations 424.30 424.30 0
1975-11-23 Bullet Perforation 424.90 427.90 7
1975-11-23 Selective Bullet Perforations 428.50 428.90 0
1975-11-23 Selective Bullet Perforations 431.90 431.90 0
1975-11-26 Fracture 366.10 431.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 2488 0.0 0.0 0.0
1977 5854 0.0 0.0 0.0
1978 4638 0.0 0.0 0.0
1979 5065 0.0 0.0 0.0
1980 5176 0.0 0.0 0.0
1981 6375 0.0 0.0 0.0
1982 2927 0.0 0.0 0.0
1983 6805 0.0 0.0 0.0
1984 7318 0.0 0.0 0.0
1985 8757 0.0 0.0 0.0
1986 7319 0.0 0.0 0.0
1987 8750 0.0 0.0 0.0
1988 8606 0.0 0.0 0.0
1989 3636 0.0 0.0 0.0

For data sources see[5]

References