X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224082516000

Well Details

Well ID: 0224082516000
Loading map...
Location: 00/16-25-022-08W4/0
Location Alias: 00/16-25-22-08 W4M
Location Alias 2: 00/16-25-022-08 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 08
Section: 25
County/Municipality: Special Areas No. 2
Well Name: RIMOIL GPNG ATLEE 16-25MR-22-8
Operator Name: Lightstream Resources Ltd.
License Number: 0055832
License Date: 1975-11-18
License Status: RecCertified
Spud Date: 1975-11-19
Final Drill Date: 1975-11-21
Well Total Depth: 426.70 m
Surface Hole Latitude: 50.905468
Surface Hole Longitude: -110.974456

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-11-18 Obtained License
1975-11-21 Finished Drilling
1975-11-21 Production Casing Operation Performed
1975-11-21 Well Mode changed to Drilled and Cased
1975-11-29 Perforation Treatment Performed - Bullet Perforation
1975-11-29 Perforation Treatment Performed - Selective Bullet Perforations
1975-12-01 Perforation Treatment Performed - Fractured
1976-09-20 Well Began Production
1976-09-20 Well Fluid changed to Gas
1976-09-20 Well Mode changed to Flowing
1989-06-01 Well Fluid changed to Gas
1989-06-01 Well Mode changed to Suspended
1992-05-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-05-01 Plug Back Performed
1992-05-01 Well Fluid changed to Gas
1992-05-01 Well Mode changed to Abandoned
1992-07-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-11-29 Selective Bullet Perforations 304.80 306.00 0
1975-11-29 Selective Bullet Perforations 322.50 322.80 0
1975-11-29 Selective Bullet Perforations 346.30 346.60 0
1975-11-29 Selective Bullet Perforations 360.00 360.30 0
1975-11-29 Bullet Perforation 360.60 362.40 7
1975-11-29 Selective Bullet Perforations 363.90 366.10 0
1975-11-29 Selective Bullet Perforations 375.80 375.80 0
1975-12-01 Fracture 304.80 375.80 0
1992-05-01 Packing Device Capped w/Cement 292.00 300.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 2362 0.0 0.0 0.0
1977 6612 0.0 0.0 0.0
1978 5030 0.0 0.0 0.0
1979 4073 0.0 0.0 0.0
1980 5175 0.0 0.0 0.0
1981 5730 0.0 0.0 0.0
1982 4651 0.0 0.0 0.0
1983 6644 0.0 0.0 0.0
1984 7318 0.0 0.0 0.0
1985 8757 0.0 0.0 0.0
1986 7005 0.0 0.0 0.0
1987 8758 0.0 0.0 0.0
1988 8723 0.0 0.0 0.0
1989 3575 0.0 0.0 0.0
1990 719 0.0 0.0 0.0

For data sources see[5]

References