X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414230808022

Well Details

Well ID: 0414230808022
Loading map...
Location: 02/08-08-041-23W4/2
Location Alias: 02/08-08-41-23 W4M
Location Alias 2: 02/08-08-041-23 W4/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 23
Section: 08
County/Municipality: Lacombe County
Well Name: AZTEK BASHAW 8-8-41-23
Operator Name: McLand Resources Ltd.
License Number: 0152583
License Date: 1992-05-29
License Status: Abandoned
Spud Date: 1992-06-15
Final Drill Date: 1992-07-05
Well Total Depth: 1840.00 m
Surface Hole Latitude: 52.511887
Surface Hole Longitude: -113.268272

For data sources see[1][2]

Well History

Date Event
1992-05-29 Obtained License
1992-06-16 Surface Casing Operation Performed
1992-06-26 Direction Drilling Operation Performed - Deviate
1992-07-05 Finished Drilling
1992-07-05 Well Mode changed to Drilled and Cased
1992-07-07 Production Casing Operation Performed
1992-07-07 Rig Released
1992-07-15 Well Log Performed
1992-07-24 Perforation Treatment Performed - Open-Hole Completion
1992-07-25 Well Log Performed
1992-08-01 Well Began Production
1992-08-01 Well Fluid changed to Crude Oil
1992-08-01 Well Mode changed to Pumping
1994-06-01 Well Fluid changed to Crude Oil
1994-06-01 Well Mode changed to Suspended
2001-12-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-10 Plug Back Performed
2001-12-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-11 Perforation Treatment Performed - Jet Perforation
2001-12-11 Perforation Treatment Performed - Remedial Casing
2001-12-11 Plug Back Performed
2002-05-22 Well Abandoned
2002-05-22 Well Fluid changed to Crude Oil
2002-05-22 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-06-26 1250.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-07-24 Open Hole/Barefoot Completion 1837.00 1840.00 0
2001-12-10 Packing Device Capped w/Cement 1814.00 1822.00 0
2001-12-11 Perforation 417.50 418.50 17
2001-12-11 Remedial Casing Cementing 417.50 418.50 0
2001-12-11 Packing Device Capped w/Cement 408.50 416.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 3187 0.0 0.0 0.0
1993 8295 0.0 0.0 0.0
1994 2798 0.0 0.0 0.0

For data sources see[6]

References