If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0595033514000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.149072,"lon":-114.345076,"icon":""}]} |
Location: 00/14-35-059-03W5/0 | |
Location Alias: 00/14-35-59-03 W5M | |
Location Alias 2: 00/14-35-059-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 03 | |
Section: 35 | |
County/Municipality: County of Barrhead No. 11 | |
Well Name: CABRE ET AL MELLOWDALE 14-35-59-3 | |
Operator Name: Enerplus Corporation | |
License Number: 0112335 | |
License Date: 1985-01-08 | |
License Status: RecCertified | |
Spud Date: 1985-02-01 | |
Final Drill Date: 1985-02-05 | |
Well Total Depth: 1125.00 m | |
Surface Hole Latitude: 54.149072 | |
Surface Hole Longitude: -114.345076 |
Date | Event |
---|---|
1985-01-08 | Obtained License |
1985-02-01 | Surface Casing Operation Performed |
1985-02-05 | Finished Drilling |
1985-02-05 | Well Log Performed |
1985-02-06 | Drill Stem Test Performed |
1985-02-08 | Production Casing Operation Performed |
1985-02-08 | Rig Released |
1985-02-15 | Well Log Performed |
1985-02-16 | Perforation Treatment Performed - Jet Perforation |
1985-02-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-03-31 | Well Mode changed to Drilled and Cased |
1986-07-11 | Well Fluid changed to Crude Oil |
1986-07-11 | Well Mode changed to Potential |
1986-07-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1986-07-12 | Plug Back Performed |
1986-07-12 | Well Fluid changed to Crude Oil |
1986-07-12 | Well Mode changed to Abandoned |
1986-08-12 | Well Abandoned |
1986-12-07 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-02-16 | Perforation | 1105.00 | 1109.00 | 13 |
1985-02-18 | Acid Treatment | 1105.00 | 1109.00 | 0 |
1986-07-12 | Packing Device Capped w/Cement | 1102.00 | 1102.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 444 | 0.0 | 0.0 | 0.0 |
For data sources see[5]