If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504261607002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.314172,"lon":-113.741663,"icon":""}]} |
Location: 00/07-16-050-26W4/2 | |
Location Alias: 00/07-16-50-26 W4M | |
Location Alias 2: 00/07-16-050-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 26 | |
Section: 16 | |
County/Municipality: Leduc County | |
Well Name: MEC LEDUC-WB 7-16-50-26 | |
Operator Name: NEP Canada ULC | |
License Number: 0000126 | |
License Date: 1949-06-24 | |
License Status: Issued | |
Spud Date: 1949-06-25 | |
Final Drill Date: 1949-08-03 | |
Well Total Depth: 1642.30 m | |
Surface Hole Latitude: 53.314172 | |
Surface Hole Longitude: -113.741663 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1949-06-24 | Obtained License |
1949-07-22 | Drill Stem Test Performed |
1949-07-27 | Liner Casing Operation Performed |
1949-08-03 | Finished Drilling |
1949-08-05 | Perforation Treatment Performed - Bullet Perforation |
1949-08-07 | Perforation Treatment Performed - Cement Squeeze |
1949-08-10 | Perforation Treatment Performed - Bullet Perforation |
1962-03-26 | Perforation Treatment Performed - Jet Perforation |
1962-03-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-03-30 | Well Mode changed to Drilled and Cased |
1963-05-09 | Well Began Production |
1963-05-09 | Well Fluid changed to Gas |
1963-05-09 | Well Mode changed to Flowing |
1983-07-05 | Well Fluid changed to Gas |
1983-07-05 | Well Mode changed to Suspended |
1986-10-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-10-29 | Perforation Treatment Performed - Cement Squeeze |
1986-10-29 | Plug Back Performed |
1986-10-29 | Well Fluid changed to Gas |
1986-10-29 | Well Mode changed to Abandoned Zone |
1986-11-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-11-07 | Well Log Performed |
1986-11-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-11-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-11-17 | Perforation Treatment Performed - Jet Perforation |
1986-11-17 | Well Log Performed |
1986-11-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-11-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-11-20 | Perforation Treatment Performed - Jet Perforation |
1997-09-14 | Perforation Treatment Performed - Cement Squeeze |
1997-09-14 | Well Log Performed |
1997-09-16 | Well Log Performed |
1997-09-18 | Well Log Performed |
1997-09-22 | Perforation Treatment Performed - Jet Perforation |
1997-09-22 | Well Log Performed |
2006-03-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1949-08-05 | Bullet Perforation | 1638.60 | 1640.10 | 20 |
1986-11-13 | Acid Treatment | 1639.20 | 1640.70 | 0 |
1986-11-17 | Perforation | 1637.00 | 1637.10 | 3 |
1986-11-18 | Acid Treatment | 1637.00 | 1637.10 | 0 |
1986-11-20 | Perforation | 1636.50 | 1636.60 | 3 |
1986-11-20 | Acid Treatment | 1636.50 | 1637.10 | 0 |
1997-09-14 | Cement Squeeze | 1636.50 | 1636.60 | 0 |
1997-09-14 | Cement Squeeze | 1637.00 | 1637.10 | 0 |
1997-09-14 | Cement Squeeze | 1639.20 | 1640.70 | 0 |
1997-09-22 | Perforation | 1625.00 | 1626.00 | 20 |
2006-03-17 | Acid Treatment | 1625.00 | 1626.00 | 0 |
1949-08-07 | Cement Squeeze | 1638.60 | 1640.10 | 0 |
1949-08-10 | Bullet Perforation | 1639.20 | 1640.70 | 20 |
1962-03-26 | Perforation | 1310.60 | 1318.30 | 7 |
1962-03-27 | Acid Treatment | 1310.60 | 1318.30 | 0 |
1986-10-27 | Acid Treatment | 1310.60 | 1318.30 | 0 |
1986-10-29 | Cement Squeeze | 1310.60 | 1318.30 | 0 |
1986-11-07 | Acid Treatment | 1639.20 | 1640.70 | 0 |
1986-11-10 | Acid Treatment | 1639.20 | 1640.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 864 | 0.0 | 0.0 | 0.0 |
1968 | 1410 | 0.0 | 0.0 | 0.0 |
1969 | 6020 | 0.0 | 0.0 | 0.0 |
1970 | 7788 | 0.0 | 0.0 | 0.0 |
1971 | 4854 | 0.0 | 0.0 | 0.0 |
1973 | 408 | 0.0 | 0.0 | 0.0 |
1974 | 312 | 0.0 | 0.0 | 0.0 |
For data sources see[5]