X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504262206020

Well Details

Well ID: 0504262206020
Loading map...
Location: 02/06-22-050-26W4/0
Location Alias: 02/06-22-50-26 W4M
Location Alias 2: 02/06-22-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 22
County/Municipality: Leduc County
Well Name: PROBE 103HZ LEDUC 7-22-50-26
Operator Name: NEP Canada ULC
License Number: B0002690
License Date: 1949-03-10
License Status: Abandoned
Spud Date: 1949-03-22
Final Drill Date: 1949-04-23
Well Total Depth: 1636.20 m
Surface Hole Latitude: 53.328437
Surface Hole Longitude: -113.723250

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-03-10 Obtained License
1949-04-23 Finished Drilling
1949-04-23 Well Mode changed to Drilled and Cased
1949-04-24 Liner Casing Operation Performed
1949-04-27 Perforation Treatment Performed - Bullet Perforation
1949-04-28 Well Began Production
1949-04-28 Well Fluid changed to Crude Oil
1949-04-28 Well Mode changed to Flowing
1957-03-12 Perforation Treatment Performed - Bullet Perforation
1957-03-12 Perforation Treatment Performed - Jet Perforation
1981-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-04-08 Well Fluid changed to Crude Oil
1983-04-08 Well Mode changed to Suspended
1987-06-01 Well Fluid changed to Crude Oil
1987-06-01 Well Mode changed to Flowing
1987-06-05 Perforation Treatment Performed - Cement Squeeze
1987-06-09 Well Log Performed
1987-06-10 Perforation Treatment Performed - Jet Perforation
1987-06-10 Well Log Performed
1987-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-03-28 Well Log Performed
1990-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-29 Perforation Treatment Performed - Jet Perforation
1990-03-29 Well Log Performed
1990-09-20 Well Fluid changed to Crude Oil
1990-09-20 Well Mode changed to Suspended
1991-02-27 Well Log Performed
1991-03-01 Perforation Treatment Performed - Jet Perforation
1991-05-13 Well Fluid changed to Crude Oil
1991-05-13 Well Mode changed to Flowing
1991-09-04 Well Log Performed
1992-01-24 Well Fluid changed to Crude Oil
1992-01-24 Well Mode changed to Suspended
1997-09-27 Well Fluid changed to Crude Oil
1997-09-27 Well Mode changed to Pumping
1998-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-02-27 Plug Back Performed
1998-02-27 Well Fluid changed to Crude Oil
1998-02-27 Well Log Performed
1998-02-27 Well Mode changed to Abandoned and Whipstocked
1998-02-28 Well Log Performed
1998-05-01 Well Log Performed
2018-12-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-04-27 Bullet Perforation 1632.20 1633.70 20
1987-06-10 Perforation 1630.20 1630.30 3
1987-06-11 Acid Treatment 1630.20 1630.30 0
1990-03-28 Packing Device Capped w/Cement 1627.00 1629.00 0
1990-03-29 Perforation 1625.00 1625.30 14
1990-03-29 Acid Treatment 1625.00 1625.30 0
1991-03-01 Perforation 1611.70 1612.00 13
1998-02-27 Packing Device Capped w/Cement 1592.00 1600.00 0
1957-03-12 Bullet Perforation 1632.80 1634.30 13
1957-03-12 Perforation 1632.80 1634.30 13
1981-10-22 Acid Treatment 1632.80 1634.30 0
1981-10-27 Acid Treatment 1632.80 1634.30 0
1981-10-28 Acid Treatment 1632.80 1634.30 0
1981-10-30 Acid Treatment 1632.80 1634.30 0
1981-11-02 Acid Treatment 1632.80 1634.30 0
1987-06-05 Cement Squeeze 1632.20 1634.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1967 120 0.0 0.0 0.0
1972 72 0.0 0.0 0.0
1974 1168 0.0 0.0 0.0
1978 2064 0.0 0.0 0.0
1979 744 0.0 0.0 0.0
1987 4595 0.0 0.0 0.0
1988 5844 0.0 0.0 0.0
1989 7410 0.0 0.0 0.0
1990 5464 0.0 0.0 0.0
1991 5568 0.0 0.0 0.0
1992 552 0.0 0.0 0.0
1998 654 0.0 0.0 0.0

For data sources see[5]

References