X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504263208003

Well Details

Well ID: 0504263208003
Loading map...
Location: 00/08-32-050-26W4/3
Location Alias: 00/08-32-50-26 W4M
Location Alias 2: 00/08-32-050-26 W4/03
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 32
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 8-32-50-26
Operator Name: NEP Canada ULC
License Number: 0002770
License Date: 1951-04-11
License Status: Abandoned
Spud Date: 1951-04-13
Final Drill Date: 1951-05-11
Well Total Depth: 1622.10 m
Surface Hole Latitude: 53.357075
Surface Hole Longitude: -113.758989

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-04-11 Obtained License
1951-05-04 Drill Stem Test Performed
1951-05-08 Liner Casing Operation Performed
1951-05-11 Finished Drilling
1951-05-11 Well Mode changed to Drilled and Cased
1951-05-14 Perforation Treatment Performed - Acid Wash - No Pressure
1951-05-14 Perforation Treatment Performed - Bullet Perforation
1951-07-30 Perforation Treatment Performed - Jet Perforation
1952-08-01 Drill Stem Test Performed
1952-08-02 Perforation Treatment Performed - Bullet Perforation
1957-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-03-12 Perforation Treatment Performed - Cement Squeeze
1964-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-06-20 Plug Back Performed
1994-06-21 Perforation Treatment Performed - Jet Perforation
1994-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-06-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-06-24 Plug Back Performed
2000-12-14 Perforation Treatment Performed - Jet Perforation
2000-12-21 Perforation Treatment Performed - Cement Squeeze
2000-12-21 Perforation Treatment Performed - Jet Perforation
2001-01-04 Perforation Treatment Performed - Jet Perforation
2001-03-15 Well Began Production
2001-03-15 Well Fluid changed to Gas
2001-03-15 Well Mode changed to Flowing
2011-09-01 Well Fluid changed to Gas
2011-09-01 Well Mode changed to Suspended
2019-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-12-15 Perforation Treatment Performed - Jet Perforation
2019-12-15 Plug Back Performed
2019-12-15 Well Fluid changed to Gas
2019-12-15 Well Log Performed
2019-12-15 Well Mode changed to Abandoned Zone
2019-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-12-16 Perforation Treatment Performed - Cement Squeeze
2019-12-16 Perforation Treatment Performed - Jet Perforation
2019-12-16 Plug Back Performed
2019-12-16 Well Log Performed
2020-03-17 Well Abandoned
2020-03-17 Well Fluid changed to Gas
2020-03-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-05-14 Bullet Perforation 1616.70 1618.20 13
1994-06-21 Perforation 1517.50 1524.00 13
1994-06-22 Acid Treatment 1517.50 1524.00 0
1994-06-24 Packing Device Capped w/Cement 1506.00 1514.00 0
2000-12-14 Perforation 1307.50 1312.00 18
2000-12-21 Perforation 1315.00 1315.50 13
2000-12-21 Cement Squeeze 1315.00 1315.50 0
2001-01-04 Perforation 1307.50 1312.00 17
2019-12-15 Packing Device Capped w/Cement 1285.00 1293.00 0
2019-12-15 Perforation 317.00 318.00 13
2019-12-15 Perforation 105.00 106.00 13
1951-05-14 Acid Wash 1616.70 1618.20 0
2019-12-16 Perforation 240.00 241.00 13
2019-12-16 Cement Squeeze 317.00 318.00 0
2019-12-16 Packing Device Capped w/Cement 305.50 313.50 0
2019-12-16 Cement Squeeze 240.00 241.00 0
2019-12-16 Packing Device Capped w/Cement 227.00 235.00 0
2019-12-16 Cement Squeeze 105.00 106.00 0
2019-12-16 Packing Device Capped w/Cement 92.00 100.00 0
1951-07-30 Perforation 1539.80 1541.70 13
1952-08-02 Bullet Perforation 1529.50 1539.80 0
1957-07-27 Acid Treatment 1529.50 1539.80 0
1964-03-12 Cement Squeeze 1529.50 1531.00 0
1964-03-18 Acid Treatment 1531.00 1541.70 0
1964-03-19 Acid Treatment 1531.00 1541.70 0
1994-06-20 Packing Device Capped w/Cement 1539.50 1547.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 5762 0.0 0.0 0.0
2002 8287 0.0 0.0 0.0
2003 7798 0.0 0.0 0.0
2004 8589 0.0 0.0 0.0
2005 8421 0.0 0.0 0.0
2006 7439 0.0 0.0 0.0
2007 2395 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-12-05 No Incident Encountered 0.00 0.00
2019-12-15 No Incident Encountered 0.00 0.00

For data sources see[6]

References