X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504263409020

Well Details

Well ID: 0504263409020
Loading map...
Location: 02/09-34-050-26W4/0
Location Alias: 02/09-34-50-26 W4M
Location Alias 2: 02/09-34-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 34
County/Municipality: Devon
Well Name: TRANS EMPIRE LEDUC NO. 9
Operator Name: Leduc-West Oil Company Limited
License Number: 0001248
License Date: 1950-03-15
License Status: RecExempt
Spud Date: 1950-03-21
Final Drill Date: 1950-05-11
Well Total Depth: 1518.50 m
Surface Hole Latitude: 53.360723
Surface Hole Longitude: -113.712627

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-03-15 Obtained License
1950-05-08 Drill Stem Test Performed
1950-05-10 Drill Stem Test Performed
1950-05-11 Finished Drilling
1950-05-11 Well Mode changed to Drilled and Cased
1950-05-12 Production Casing Operation Performed
1950-05-17 Perforation Treatment Performed - Bullet Perforation
1950-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-05-22 Perforation Treatment Performed - Acid Wash - No Pressure
1950-06-24 Well Began Production
1950-06-24 Well Fluid changed to Crude Oil
1950-06-24 Well Mode changed to Pumping
1952-11-04 Perforation Treatment Performed - Jet Perforation
1956-01-01 Perforation Treatment Performed - Cement Plug
1956-06-10 Perforation Treatment Performed - Bullet Perforation
1956-06-12 Perforation Treatment Performed - Acid Wash - No Pressure
1956-06-22 Perforation Treatment Performed - Cement Plug
1956-07-26 Well Abandoned
1956-07-26 Well Fluid changed to Crude Oil
1956-07-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-05-17 Bullet Perforation 1506.30 1509.40 10
1956-01-01 Cement Plug 1335.60 1518.50 0
1956-06-10 Bullet Perforation 1277.10 1277.40 0
1956-06-12 Acid Wash 1277.10 1277.40 0
1956-06-22 Cement Plug 1277.10 1295.40 0
1950-05-17 Bullet Perforation 1503.30 1505.10 10
1950-05-17 Bullet Perforation 1494.70 1499.60 10
1950-05-17 Bullet Perforation 1489.90 1491.70 10
1950-05-17 Bullet Perforation 1486.50 1488.30 10
1950-05-18 Acid Treatment 1486.50 1509.40 0
1950-05-22 Acid Wash 1486.50 1509.40 0
1952-11-04 Perforation 1496.00 1498.10 13
1952-11-04 Perforation 1500.80 1508.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References