X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504263410030

Well Details

Well ID: 0504263410030
Loading map...
Location: 03/10-34-050-26W4/0
Location Alias: 03/10-34-50-26 W4M
Location Alias 2: 03/10-34-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 34
County/Municipality: Leduc County
Well Name: NEP 103 HZ LEDUC-WB 10-34-50-26
Operator Name: NEP Canada ULC
License Number: 0497449
License Date: 2020-01-17
License Status: Amended
Spud Date: 2020-02-11
Final Drill Date: 2020-02-18
Well Total Depth: 5068.00 m
Surface Hole Latitude: 53.328897
Surface Hole Longitude: -113.717159

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-02-10 Ensign Drilling Inc. 32 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-02-13 1162.50 Deviate (5 - 79 degrees)
2020-02-14 1723.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-03-07 Multi-Stage Fracture 5024.30 5024.40 0
2020-03-07 Multi-Stage Fracture 3963.60 3963.70 0
2020-03-08 Multi-Stage Fracture 3765.60 3765.70 0
2020-03-08 Multi-Stage Fracture 3568.90 3569.00 0
2020-03-08 Multi-Stage Fracture 3353.60 3353.70 0
2020-03-08 Multi-Stage Fracture 3239.00 3239.10 0
2020-03-08 Multi-Stage Fracture 3124.30 3124.40 0
2020-03-08 Multi-Stage Fracture 3021.60 3021.70 0
2020-03-08 Multi-Stage Fracture 2905.10 2905.20 0
2020-03-08 Multi-Stage Fracture 2789.50 2789.60 0
2020-03-08 Multi-Stage Fracture 2672.90 2673.00 0
2020-03-07 Multi-Stage Fracture 4920.80 4920.90 0
2020-03-08 Multi-Stage Fracture 2555.30 2555.40 0
2020-03-08 Multi-Stage Fracture 2439.90 2440.00 0
2020-03-08 Multi-Stage Fracture 2337.20 2337.30 0
2020-03-08 Multi-Stage Fracture 2221.00 2221.10 0
2020-03-08 Multi-Stage Fracture 2090.90 2091.00 0
2020-03-08 Multi-Stage Fracture 1961.10 1961.20 0
2020-03-08 Multi-Stage Fracture 1832.10 1832.20 0
2020-03-07 Multi-Stage Fracture 4818.80 4818.90 0
2020-03-07 Multi-Stage Fracture 4691.00 4691.10 0
2020-03-07 Multi-Stage Fracture 4560.90 4561.00 0
2020-03-07 Multi-Stage Fracture 4447.70 4447.80 0
2020-03-07 Multi-Stage Fracture 4334.90 4335.00 0
2020-03-07 Multi-Stage Fracture 4221.20 4221.30 0
2020-03-07 Multi-Stage Fracture 4091.80 4091.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 168 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-20 No Incident Encountered 0.00 0.00
2020-03-08 No Incident Encountered 0.00 0.00

For data sources see[7]

References