X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425092503000

Well Details

Well ID: 0425092503000
Loading map...
Location: 00/03-25-042-09W5/0
Location Alias: 00/03-25-42-09 W5M
Location Alias 2: 00/03-25-042-09 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 09
Section: 25
County/Municipality: Clearwater County
Well Name: SHANGHAIEN WILLGR 3-25-42-9
Operator Name: Shanghai Energy Corporation
License Number: 0443981
License Date: 2012-02-09
License Status: Issued
Spud Date: 2012-02-25
Final Drill Date: 2012-03-16
Well Total Depth: 3605.00 m
Surface Hole Latitude: 52.656364
Surface Hole Longitude: -115.167659

For data sources see[1][2]

Well History

Date Event
2012-02-09 Obtained License
2012-03-01 Surface Casing Operation Performed
2012-03-04 Direction Drilling Operation Performed - Horizontal
2012-03-07 Lost Circulation Occurred
2012-03-09 Intermediate Casing Operation Performed
2012-03-16 Finished Drilling
2012-03-16 Well Log Performed
2012-03-16 Well Mode changed to Drilled and Cased
2012-03-19 Liner Casing Operation Performed
2012-03-20 Rig Released
2012-07-08 Well Log Performed
2012-08-05 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-05 Perforation Treatment Performed - Open-Hole Completion
2012-08-08 Well Began Production
2012-08-08 Well Fluid changed to Crude Oil
2012-08-08 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-25 Beaver Drilling Ltd. 10 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-03-04 1632.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-05 Open Hole/Barefoot Completion 3600.00 3605.00 0
2012-08-05 Multi-Stage Fracture 2921.90 2922.00 0
2012-08-05 Multi-Stage Fracture 2834.30 2834.40 0
2012-08-05 Multi-Stage Fracture 2747.00 2747.10 0
2012-08-05 Multi-Stage Fracture 2672.70 2672.80 0
2012-08-05 Multi-Stage Fracture 2584.20 2584.30 0
2012-08-05 Multi-Stage Fracture 2496.40 2496.50 0
2012-08-05 Multi-Stage Fracture 3590.70 3590.80 0
2012-08-05 Multi-Stage Fracture 3509.60 3509.70 0
2012-08-05 Multi-Stage Fracture 3434.20 3434.30 0
2012-08-05 Multi-Stage Fracture 3346.40 3346.50 0
2012-08-05 Multi-Stage Fracture 3257.40 3257.50 0
2012-08-05 Multi-Stage Fracture 3170.20 3170.30 0
2012-08-05 Multi-Stage Fracture 3095.80 3095.90 0
2012-08-05 Multi-Stage Fracture 3009.10 3009.20 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3325 0.0 0.0 0.0
2013 8570 0.0 0.0 0.0
2014 8640 0.0 0.0 0.0
2015 4848 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8640 0.0 0.0 0.0
2018 8015 0.0 0.0 0.0
2019 432 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-07 Lost Circulation 2224.00 2227.00
2012-08-11 No Incident Encountered 0.00 0.00

For data sources see[8]

References