X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514260904000

Well Details

Well ID: 0514260904000
Loading map...
Location: 00/04-09-051-26W4/0
Location Alias: 00/04-09-51-26 W4M
Location Alias 2: 00/04-09-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 09
County/Municipality: Parkland County
Well Name: MEC LEDUC-WB 4-9-51-26
Operator Name: NEP Canada ULC
License Number: 0002848
License Date: 1951-05-05
License Status: RecCertified
Spud Date: 1951-06-01
Final Drill Date: 1951-06-29
Well Total Depth: 1621.80 m
Surface Hole Latitude: 53.383380
Surface Hole Longitude: -113.784456

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-05-05 Obtained License
1951-06-15 Drill Stem Test Performed
1951-06-21 Drill Stem Test Performed
1951-06-22 Drill Stem Test Performed
1951-06-23 Drill Stem Test Performed
1951-06-25 Liner Casing Operation Performed
1951-06-29 Finished Drilling
1951-06-29 Well Mode changed to Drilled and Cased
1951-07-02 Perforation Treatment Performed - Open-Hole Completion
1951-07-03 Well Began Production
1951-07-03 Well Fluid changed to Crude Oil
1951-07-03 Well Mode changed to Flowing
1972-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-01-18 Well Fluid changed to Crude Oil
1972-01-18 Well Mode changed to Pumping
1980-04-27 Perforation Treatment Performed - Cement Squeeze
1980-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-01 Perforation Treatment Performed - Selective Jet Perforations
1981-07-08 Perforation Treatment Performed - Cement Squeeze
1981-07-13 Perforation Treatment Performed - Selective Jet Perforations
1981-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-04-11 Well Fluid changed to Crude Oil
1983-04-11 Well Mode changed to Suspended
1985-10-28 Well Log Performed
1985-10-30 Perforation Treatment Performed - Cement Squeeze
1985-11-01 Well Log Performed
1985-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-04 Perforation Treatment Performed - Selective Jet Perforations
1992-08-08 Well Log Performed
1993-12-02 Well Log Performed
1994-04-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-04-21 Plug Back Performed
1994-04-21 Well Fluid changed to Crude Oil
1994-04-21 Well Mode changed to Abandoned Zone
1994-04-23 Perforation Treatment Performed - Jet Perforation
1994-04-24 Perforation Treatment Performed - Fractured
2002-02-04 Perforation Treatment Performed - Cement Squeeze
2002-02-04 Plug Back Performed
2002-02-06 Perforation Treatment Performed - Jet Perforation
2002-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-04-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-04-18 Plug Back Performed
2006-04-19 Perforation Treatment Performed - Jet Perforation
2006-04-20 Perforation Treatment Performed - Remedial Casing
2007-04-02 Perforation Treatment Performed - Jet Perforation
2007-04-02 Perforation Treatment Performed - Remedial Casing
2007-04-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-07-02 Open Hole/Barefoot Completion 1620.30 1621.80 0
1985-11-04 Selective Jet Perforations 1614.40 1616.50 0
1985-11-04 Acid Treatment 1614.40 1616.50 0
1994-04-21 Packing Device Capped w/Cement 1560.50 1568.50 0
1994-04-23 Perforation 1354.50 1357.50 16
1994-04-24 Fracture 1354.50 1357.50 0
2002-02-04 Cement Squeeze 1354.50 1357.50 0
2002-02-06 Perforation 1380.50 1382.00 17
2002-02-06 Perforation 1377.00 1379.00 17
2002-02-06 Perforation 1372.00 1375.00 17
2002-02-08 Acid Treatment 1380.50 1382.00 0
1972-01-15 Acid Treatment 1620.30 1621.80 0
2002-02-08 Acid Treatment 1377.00 1379.00 0
2002-02-08 Acid Treatment 1372.00 1375.00 0
2002-02-13 Acid Treatment 1380.50 1382.00 0
2002-02-13 Acid Treatment 1377.00 1379.00 0
2002-02-13 Acid Treatment 1372.00 1375.00 0
2006-04-18 Packing Device Capped w/Cement 1357.00 1365.00 0
2006-04-19 Perforation 580.00 581.00 13
2006-04-19 Perforation 549.00 550.00 13
2006-04-20 Remedial Casing Cementing 580.00 581.00 0
2006-04-20 Remedial Casing Cementing 549.00 550.00 0
1980-04-27 Cement Squeeze 1620.30 1621.80 0
2007-04-02 Perforation 221.00 310.00 17
2007-04-02 Remedial Casing Cementing 221.00 310.00 0
1980-05-01 Selective Jet Perforations 1619.50 1619.60 0
1980-05-01 Acid Treatment 1619.50 1619.60 0
1981-07-08 Cement Squeeze 1619.50 1619.60 0
1981-07-13 Selective Jet Perforations 1619.70 1619.80 0
1981-07-14 Acid Treatment 1619.70 1619.80 0
1985-10-30 Cement Squeeze 1619.70 1619.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2678 0.0 0.0 0.0
1968 4010 0.0 0.0 0.0
1970 1742 0.0 0.0 0.0
1971 3984 0.0 0.0 0.0
1972 8028 0.0 0.0 0.0
1973 8583 0.0 0.0 0.0
1974 8585 0.0 0.0 0.0
1975 8259 0.0 0.0 0.0
1976 8316 0.0 0.0 0.0
1977 8160 0.0 0.0 0.0
1978 7799 0.0 0.0 0.0
1979 8128 0.0 0.0 0.0
1980 7663 0.0 0.0 0.0
1981 7015 0.0 0.0 0.0
1982 228 0.0 0.0 0.0
1985 72 0.0 0.0 0.0

For data sources see[5]

References