X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514261209000

Well Details

Well ID: 0514261209000
Loading map...
Location: 00/09-12-051-26W4/0
Location Alias: 00/09-12-51-26 W4M
Location Alias 2: 00/09-12-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 12
County/Municipality: Parkland County
Well Name: CONTINENTAL NATIONAL WOODBEND NO. 15
Operator Name: Westburne Petroleum & Minerals Ltd.
License Number: B0002624
License Date: 1949-02-09
License Status: RecCertified
Spud Date: 1950-03-29
Final Drill Date: 1950-04-25
Well Total Depth: 1304.50 m
Surface Hole Latitude: 53.390541
Surface Hole Longitude: -113.691837

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-02-09 Obtained License
1949-04-25 Perforation Treatment Performed - Open-Hole Completion
1950-04-22 Drill Stem Test Performed
1950-04-25 Finished Drilling
1950-04-25 Well Mode changed to Drilled and Cased
1950-04-27 Well Began Production
1950-04-27 Well Fluid changed to Crude Oil
1950-04-27 Well Mode changed to Flowing
1957-02-25 Well Fluid changed to Crude Oil
1957-02-25 Well Mode changed to Pumping
1976-05-08 Liner Casing Operation Performed
1976-05-12 Perforation Treatment Performed - Jet Perforation
1976-05-21 Perforation Treatment Performed - Jet Perforation
1976-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-05-30 Perforation Treatment Performed - Cement Squeeze
1976-06-03 Perforation Treatment Performed - Jet Perforation
1978-01-18 Well Fluid changed to Crude Oil
1978-01-18 Well Mode changed to Suspended
1982-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-10-20 Well Fluid changed to Crude Oil
1982-10-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-04-25 Open Hole/Barefoot Completion 1289.00 1292.00 0
1976-05-12 Perforation 1288.40 1289.00 13
1976-05-21 Perforation 1285.30 1286.00 13
1976-05-26 Acid Treatment 1288.40 1289.00 0
1976-05-30 Cement Squeeze 1285.30 1289.00 0
1976-06-03 Perforation 1286.60 1287.20 13
1982-10-20 Packing Device Capped w/Cement 1217.00 1225.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 3382 0.0 0.0 0.0
1970 936 0.0 0.0 0.0
1971 6990 0.0 0.0 0.0
1972 4792 0.0 0.0 0.0
1973 5219 0.0 0.0 0.0
1974 6655 0.0 0.0 0.0
1975 7811 0.0 0.0 0.0
1976 3425 0.0 0.0 0.0

For data sources see[5]

References