X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0714251010000

Well Details

Well ID: 0714251010000
Loading map...
Location: 00/10-10-071-25W4/0
Location Alias: 00/10-10-71-25 W4M
Location Alias 2: 00/10-10-071-25 W4/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 4
Range: 25
Section: 10
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: RIFE SMITH 10-10-71-25
Operator Name: Rife Resources Ltd.
License Number: 0147946
License Date: 1991-02-13
License Status: RecCertified
Spud Date: 1991-02-14
Final Drill Date: 1991-02-17
Well Total Depth: 663.00 m
Surface Hole Latitude: 55.134985
Surface Hole Longitude: -113.761560

For data sources see[1][2]

Well History

Date Event
1991-02-13 Obtained License
1991-02-14 Surface Casing Operation Performed
1991-02-17 Finished Drilling
1991-02-17 Well Log Performed
1991-02-17 Well Mode changed to Drilled and Cased
1991-02-19 Production Casing Operation Performed
1991-02-19 Rig Released
1991-03-06 Perforation Treatment Performed - Jet Perforation
1991-03-06 Well Log Performed
1993-06-17 Well Began Production
1993-06-17 Well Fluid changed to Gas
1993-06-17 Well Mode changed to Flowing
1993-09-05 Perforation Treatment Performed - Jet Perforation
1993-09-05 Well Fluid changed to Gas
1993-09-05 Well Log Performed
1993-09-05 Well Mode changed to Flowing
1995-01-21 Well Log Performed
1995-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-23 Perforation Treatment Performed - Cement Squeeze
1995-01-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-01-27 Plug Back Performed
1995-01-27 Well Fluid changed to Gas
1995-01-27 Well Log Performed
1995-01-27 Well Mode changed to Abandoned Zone
1995-01-29 Perforation Treatment Performed - Jet Perforation
1995-01-29 Well Log Performed
1996-03-13 Well Log Performed
1997-01-07 Well Log Performed
1997-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-01-08 Perforation Treatment Performed - Jet Perforation
1997-01-08 Plug Back Performed
2007-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-01-26 Plug Back Performed
2007-02-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-03-06 Perforation 639.00 640.00 13
1997-01-08 Packing Device Capped w/Cement 482.00 490.00 0
1997-01-08 Perforation 456.50 458.00 20
2007-01-26 Packing Device Capped w/Cement 467.00 475.00 0
2007-01-26 Packing Device Capped w/Cement 445.00 453.00 0
1991-03-06 Perforation 642.00 646.00 13
1993-09-05 Perforation 529.00 530.00 13
1995-01-23 Acid Treatment 529.00 530.00 0
1995-01-23 Cement Squeeze 529.00 530.00 0
1995-01-27 Packing Device Capped w/Cement 528.90 536.90 0
1995-01-27 Packing Device Capped w/Cement 517.00 525.00 0
1995-01-29 Perforation 496.00 498.00 13
1995-01-29 Perforation 512.00 513.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 4328 0.0 0.0 0.0
1994 8714 0.0 0.0 0.0

For data sources see[5]

References