X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0614081509002

Well Details

Well ID: 0614081509002
Loading map...
Location: 00/09-15-061-08W4/2
Location Alias: 00/09-15-61-08 W4M
Location Alias 2: 00/09-15-061-08 W4/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 4
Range: 08
Section: 15
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: Vantage SUGDEN 9-15-61-8
Operator Name: Vantage Point Resources Inc.
License Number: 0204233
License Date: 1997-07-31
License Status: Issued
Spud Date: 1997-08-23
Final Drill Date: 1997-08-25
Well Total Depth: 446.00 m
Surface Hole Latitude: 54.276192
Surface Hole Longitude: -111.106155

For data sources see[1][2]

Well History

Date Event
1997-07-31 Obtained License
1997-08-24 Surface Casing Operation Performed
1997-08-25 Finished Drilling
1997-08-25 Production Casing Operation Performed
1997-08-25 Rig Released
1997-08-25 Well Log Performed
1997-08-25 Well Mode changed to Drilled and Cased
2000-04-12 Perforation Treatment Performed - Jet Perforation
2000-04-12 Well Log Performed
2000-06-28 Perforation Treatment Performed - Jet Perforation
2000-06-28 Well Log Performed
2000-06-28 Well Mode changed to Drilled and Cased
2007-09-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-09-15 Plug Back Performed
2007-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-09-16 Perforation Treatment Performed - Jet Perforation
2007-09-16 Well Log Performed
2007-09-16 Well Mode changed to Abandoned Zone
2008-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-02 Plug Back Performed
2008-03-03 Perforation Treatment Performed - Jet Perforation
2008-03-03 Well Log Performed
2008-03-11 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-04-12 Perforation 388.00 391.00 39
2000-06-28 Perforation 341.00 343.50 39
2007-09-15 Packing Device Capped w/Cement 378.00 386.00 0
2007-09-16 Packing Device Capped w/Cement 334.00 338.00 0
2007-09-16 Perforation 326.00 328.00 17
2008-03-02 Packing Device Capped w/Cement 310.00 320.00 0
2008-03-03 Perforation 287.60 293.60 17
2008-03-11 Fracture 287.60 293.60 0

For data sources see[4]



References