If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434091814002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.699193,"lon":-111.287193,"icon":""}]} |
Location: 00/14-18-043-09W4/2 | |
Location Alias: 00/14-18-43-09 W4M | |
Location Alias 2: 00/14-18-043-09 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 4 | |
Range: 09 | |
Section: 18 | |
County/Municipality: Flagstaff County | |
Well Name: CLEO ENERGY KILLAM 1-18-43-9 | |
Operator Name: Cleo Energy Corp. | |
License Number: 0426117 | |
License Date: 2010-11-22 | |
License Status: Amended | |
Spud Date: 2010-11-27 | |
Final Drill Date: 2010-12-11 | |
Well Total Depth: 1962.00 m | |
Surface Hole Latitude: 52.699193 | |
Surface Hole Longitude: -111.287193 |
Date | Event |
---|---|
2010-11-22 | Obtained License |
2010-11-28 | Surface Casing Operation Performed |
2010-12-06 | Direction Drilling Operation Performed - Horizontal |
2010-12-08 | Intermediate Casing Operation Performed |
2010-12-11 | Finished Drilling |
2010-12-11 | Well Mode changed to Drilled and Cased |
2010-12-12 | Liner Casing Operation Performed |
2010-12-13 | Rig Released |
2011-01-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-01-29 | Perforation Treatment Performed - Open-Hole Completion |
2011-08-16 | Well Began Production |
2011-08-16 | Well Fluid changed to Gas |
2011-08-16 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-12-06 | 310.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-29 | Open Hole/Barefoot Completion | 1929.20 | 1962.00 | 0 |
2011-01-29 | Multi-Stage Fracture | 1210.20 | 1210.50 | 0 |
2011-01-29 | Multi-Stage Fracture | 1135.20 | 1135.50 | 0 |
2011-01-29 | Multi-Stage Fracture | 1073.40 | 1073.70 | 0 |
2011-01-29 | Multi-Stage Fracture | 984.30 | 984.60 | 0 |
2011-01-29 | Multi-Stage Fracture | 895.20 | 895.50 | 0 |
2011-01-29 | Multi-Stage Fracture | 806.10 | 806.40 | 0 |
2011-01-29 | Multi-Stage Fracture | 1925.00 | 1925.30 | 0 |
2011-01-29 | Multi-Stage Fracture | 1850.20 | 1850.50 | 0 |
2011-01-29 | Multi-Stage Fracture | 1734.30 | 1734.60 | 0 |
2011-01-29 | Multi-Stage Fracture | 1632.60 | 1632.90 | 0 |
2011-01-29 | Multi-Stage Fracture | 1503.90 | 1504.20 | 0 |
2011-01-29 | Multi-Stage Fracture | 1414.80 | 1415.10 | 0 |
2011-01-29 | Multi-Stage Fracture | 1353.30 | 1353.60 | 0 |
2011-01-29 | Multi-Stage Fracture | 1291.50 | 1291.80 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 3316 | 0.0 | 0.0 | 0.0 |
2012 | 8635 | 0.0 | 0.0 | 0.0 |
2013 | 8617 | 0.0 | 0.0 | 0.0 |
2014 | 7675 | 0.0 | 0.0 | 0.0 |
2015 | 7520 | 0.0 | 0.0 | 0.0 |
2016 | 8518 | 0.0 | 0.0 | 0.0 |
2017 | 8644 | 0.0 | 0.0 | 0.0 |
2018 | 7295 | 0.0 | 0.0 | 0.0 |
For data sources see[6]