If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0716042003020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.169558,"lon":-118.585176,"icon":""}]} |
Location: 02/03-20-071-04W6/0 | |
Location Alias: 02/03-20-71-04 W6M | |
Location Alias 2: 02/03-20-071-04 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 071 | |
Meridian: 6 | |
Range: 04 | |
Section: 20 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: CANAMAX GRANDPR 3-20-71-4 | |
Operator Name: Canamax Energy Ltd. | |
License Number: 0412992 | |
License Date: 2009-10-08 | |
License Status: Amended | |
Spud Date: 2010-08-06 | |
Final Drill Date: 2010-08-15 | |
Well Total Depth: 2242.00 m | |
Surface Hole Latitude: 55.169558 | |
Surface Hole Longitude: -118.585176 |
Date | Event |
---|---|
2009-10-08 | Obtained License |
2010-08-06 | Surface Casing Operation Performed |
2010-08-08 | Direction Drilling Operation Performed - Horizontal |
2010-08-10 | Intermediate Casing Operation Performed |
2010-08-15 | Finished Drilling |
2010-08-15 | Well Mode changed to Drilled and Cased |
2010-08-17 | Liner Casing Operation Performed |
2010-08-17 | Perforation Treatment Performed - Open-Hole Completion |
2010-08-18 | Rig Released |
2010-09-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-12-17 | Well Began Production |
2010-12-17 | Well Fluid changed to Crude Oil |
2010-12-17 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-08-08 | 721.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-08-17 | Open Hole/Barefoot Completion | 1097.00 | 2242.00 | 0 |
2010-09-22 | Multi-Stage Fracture | 1128.70 | 2242.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 334 | 0.0 | 0.0 | 0.0 |
2011 | 8001 | 0.0 | 0.0 | 0.0 |
2012 | 7980 | 0.0 | 0.0 | 0.0 |
2013 | 8543 | 0.0 | 0.0 | 0.0 |
2014 | 8322 | 0.0 | 0.0 | 0.0 |
2015 | 8671 | 0.0 | 0.0 | 0.0 |
2016 | 8520 | 0.0 | 0.0 | 0.0 |
2017 | 8255 | 0.0 | 0.0 | 0.0 |
2018 | 7645 | 0.0 | 0.0 | 0.0 |
2019 | 8330 | 0.0 | 0.0 | 0.0 |
2020 | 2121 | 0.0 | 0.0 | 0.0 |
For data sources see[6]