If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0614171813000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.27942,"lon":-112.545719,"icon":""}]} |
Location: 00/13-18-061-17W4/0 | |
Location Alias: 00/13-18-61-17 W4M | |
Location Alias 2: 00/13-18-061-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 4 | |
Range: 17 | |
Section: 18 | |
County/Municipality: Smoky Lake County | |
Well Name: RHE EDWAND 13-18-61-17 | |
Operator Name: Rolling Hills Energy Ltd. | |
License Number: 0143486 | |
License Date: 1990-02-28 | |
License Status: Issued | |
Spud Date: 1990-03-10 | |
Final Drill Date: 1990-03-12 | |
Well Total Depth: 695.00 m | |
Surface Hole Latitude: 54.279420 | |
Surface Hole Longitude: -112.545719 |
Date | Event |
---|---|
1990-02-28 | Obtained License |
1990-03-11 | Surface Casing Operation Performed |
1990-03-12 | Finished Drilling |
1990-03-12 | Well Mode changed to Drilled and Cased |
1990-03-13 | Drill Stem Test Performed |
1990-03-13 | Well Log Performed |
1990-03-14 | Production Casing Operation Performed |
1990-03-14 | Rig Released |
1990-06-20 | Perforation Treatment Performed - Jet Perforation |
1990-06-29 | Perforation Treatment Performed - Jet Perforation |
1990-09-26 | Well Began Production |
1990-09-26 | Well Fluid changed to Gas |
1990-09-26 | Well Mode changed to Flowing |
1990-11-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-11-17 | Perforation Treatment Performed - Jet Perforation |
1990-11-17 | Plug Back Performed |
1990-11-17 | Well Fluid changed to Gas |
1990-11-17 | Well Mode changed to Abandoned Zone |
1993-05-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-05-18 | Plug Back Performed |
1993-05-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-05-19 | Plug Back Performed |
1993-05-19 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-06-20 | Perforation | 675.50 | 677.00 | 13 |
1990-06-29 | Perforation | 595.00 | 597.00 | 13 |
1990-11-17 | Packing Device Capped w/Cement | 658.00 | 666.00 | 0 |
1990-11-17 | Perforation | 546.00 | 547.50 | 13 |
1993-05-18 | Packing Device Capped w/Cement | 547.00 | 555.00 | 0 |
1993-05-19 | Packing Device Capped w/Cement | 534.00 | 542.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 1105 | 0.0 | 0.0 | 0.0 |
For data sources see[5]