X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-24275

Well Details

Well ID: 37-129-24275
Loading map...
Operator Name: KRIEBEL MINERALS INC
First Permit Date: 1999-07-16
Last Permit Date: 1999-07-16
Spud Date: 1999-09-10
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.154356
Longitude: -79.564307

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 1565.0 334.0 0.0 0.0 0.0 0.0
2012-0 1222.0 335.0 0.0 0.0 0.0 0.0
2011-0 1292.0 334.0 0.0 0.0 0.0 0.0
2010-0 1937.0 365.0 0.0 0.0 0.0 0.0
2009-0 1426.0 334.0 0.0 0.0 0.0 0.0
2008-0 2500.0 366.0 0.0 0.0 0.0 0.0
2007-0 2123.0 365.0 0.0 0.0 0.0 0.0
2006-0 2427.0 365.0 0.0 0.0 0.0 0.0
2005-0 3056.0 351.0 0.0 0.0 0.0 0.0
2004-0 3745.0 363.0 0.0 0.0 0.0 0.0
2003-0 3900.0 356.0 0.0 0.0 0.0 0.0
2002-0 4001.0 351.0 0.0 0.0 0.0 0.0
2001-0 3898.0 354.0 0.0 0.0 0.0 0.0
2000-0 9658.0 337.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2002-0 BRINE 50.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY
2013-0 PRODUCED FLUID 35.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
837843 1999-09-23 No Violations Noted @3660'; ID, PITS, E&S OK
837913 1999-09-16 No Violations Noted GRADED; NOT SPUDDED, E&S OK
903317 1999-12-10 No Violations Noted PROD GAS; TAG, TANK, E&S OK
947338 2000-06-26 No Violations Noted equipped/restored/tank&tag ok
1564390 2006-08-29 No Violations Noted TAG/TANK/E&S OK
1618631 2007-04-24 No Violations Noted TAG, TANK, E&S OK.
1814370 2009-07-14 No Violations Noted Well site appears to be in production. There is no evidence of accelerated erosion or sedimentation on the access road or well site. Brine Tank located on-site is in sound condition. The operator should continue to monitor the site for erosion and sedimentation.

References