X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524011602020

Well Details

Well ID: 0524011602020
Loading map...
Location: 02/02-16-052-01W4/0
Location Alias: 02/02-16-52-01 W4M
Location Alias 2: 02/02-16-052-01 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 01
Section: 16
County/Municipality: County of Vermilion River
Well Name: RIFE 102 LLOYD 2-16-52-1
Operator Name: Rife Resources Ltd.
License Number: 0360235
License Date: 2006-07-17
License Status: Abandoned
Spud Date: 2006-08-02
Final Drill Date: 2006-08-04
Well Total Depth: 591.00 m
Surface Hole Latitude: 53.483242
Surface Hole Longitude: -110.084674

For data sources see[1][2]

Well History

Date Event
2006-07-17 Obtained License
2006-08-02 Direction Drilling Operation Performed - Deviate
2006-08-03 Surface Casing Operation Performed
2006-08-04 Finished Drilling
2006-08-04 Well Log Performed
2006-08-04 Well Mode changed to Drilled and Cased
2006-08-05 Production Casing Operation Performed
2006-08-05 Rig Released
2006-10-18 Perforation Treatment Performed - Jet Perforation
2006-10-18 Well Began Production
2006-10-18 Well Fluid changed to Crude Oil
2006-10-18 Well Mode changed to Pumping
2007-11-01 Well Log Performed
2009-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-14 Plug Back Performed
2009-03-14 Well Fluid changed to Crude Oil
2009-03-14 Well Mode changed to Abandoned Zone
2009-06-26 Well Abandoned
2009-06-26 Well Fluid changed to Crude Oil
2009-06-26 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-08-02 46.20 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-10-18 Perforation 534.00 535.50 26
2006-10-18 Perforation 538.00 539.50 26
2009-03-14 Packing Device Capped w/Cement 523.00 531.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 76 0.0 0.0 0.0
2007 2678 0.0 0.0 0.0
2008 44 0.0 0.0 0.0

For data sources see[6]

References