If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0615262109002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.302076,"lon":-117.859874,"icon":""}]} |
Location: 00/09-21-061-26W5/2 | |
Location Alias: 00/09-21-61-26 W5M | |
Location Alias 2: 00/09-21-061-26 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 5 | |
Range: 26 | |
Section: 21 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CEQUENCE 7-29 HZ SIMON 9-21-61-26 | |
Operator Name: Cequence Energy Ltd. | |
License Number: 0448769 | |
License Date: 2012-09-27 | |
License Status: Amended | |
Spud Date: 2013-01-13 | |
Final Drill Date: 2013-02-23 | |
Well Total Depth: 5431.00 m | |
Surface Hole Latitude: 54.302076 | |
Surface Hole Longitude: -117.859874 |
Date | Event |
---|---|
2012-09-27 | Obtained License |
2013-01-29 | Direction Drilling Operation Performed - Horizontal |
2013-02-06 | Intermediate Casing Operation Performed |
2013-02-23 | Finished Drilling |
2013-02-23 | Well Mode changed to Drilled and Cased |
2013-02-24 | Liner Casing Operation Performed |
2013-02-26 | Rig Released |
2013-03-01 | Perforation Treatment Performed - Open-Hole Completion |
2013-03-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-03-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-03-13 | Well Began Production |
2013-03-13 | Well Fluid changed to Gas |
2013-03-13 | Well Mode changed to Flowing |
2013-03-20 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2013-01-29 | 3035.60 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-03-01 | Open Hole/Barefoot Completion | 5420.50 | 5431.00 | 0 |
2013-03-10 | Multi-Stage Fracture | 4752.90 | 4753.00 | 0 |
2013-03-11 | Multi-Stage Fracture | 4668.10 | 4668.20 | 0 |
2013-03-11 | Multi-Stage Fracture | 4583.30 | 4583.40 | 0 |
2013-03-11 | Multi-Stage Fracture | 4485.10 | 4485.20 | 0 |
2013-03-11 | Multi-Stage Fracture | 4400.20 | 4400.30 | 0 |
2013-03-11 | Multi-Stage Fracture | 4315.50 | 4315.60 | 0 |
2013-03-11 | Multi-Stage Fracture | 4230.70 | 4230.80 | 0 |
2013-03-11 | Multi-Stage Fracture | 4145.80 | 4145.90 | 0 |
2013-03-11 | Multi-Stage Fracture | 4060.90 | 4061.00 | 0 |
2013-03-11 | Multi-Stage Fracture | 3976.10 | 3976.20 | 0 |
2013-03-10 | Multi-Stage Fracture | 5405.30 | 5412.30 | 0 |
2013-03-11 | Multi-Stage Fracture | 3891.30 | 3891.40 | 0 |
2013-03-11 | Multi-Stage Fracture | 3806.40 | 3806.50 | 0 |
2013-03-11 | Multi-Stage Fracture | 3721.50 | 3721.60 | 0 |
2013-03-11 | Multi-Stage Fracture | 3636.90 | 3637.00 | 0 |
2013-03-11 | Multi-Stage Fracture | 3552.20 | 3552.30 | 0 |
2013-03-11 | Multi-Stage Fracture | 3454.30 | 3454.40 | 0 |
2013-03-11 | Multi-Stage Fracture | 3369.60 | 3369.70 | 0 |
2013-03-11 | Multi-Stage Fracture | 3284.80 | 3284.90 | 0 |
2013-03-11 | Multi-Stage Fracture | 3200.10 | 3200.20 | 0 |
2013-03-10 | Multi-Stage Fracture | 5347.00 | 5347.10 | 0 |
2013-03-10 | Multi-Stage Fracture | 5262.10 | 5262.20 | 0 |
2013-03-10 | Multi-Stage Fracture | 5177.30 | 5177.40 | 0 |
2013-03-10 | Multi-Stage Fracture | 5092.40 | 5092.50 | 0 |
2013-03-10 | Multi-Stage Fracture | 5007.50 | 5007.60 | 0 |
2013-03-10 | Multi-Stage Fracture | 4922.60 | 4922.70 | 0 |
2013-03-10 | Multi-Stage Fracture | 4837.70 | 4837.80 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-03-10 | 2013-03-11 | 2,984 | 8,015 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 83.1512 | N/A | |||
30/50 Prime Plus | Calfrac | Quartz | 14808-60-7 | 100 | 1.3557 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 10.8376 | N/A | ||
50/140 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 1.4106 | N/A | ||
Tolcide PS75LT | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0123 | N/A | |
Water | 7732-18-5 | 100 | 0.0131 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0783 | N/A | |
DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0902 | N/A | |
Ethoxylated phenolic resin | 8300 | 100 | 0.0917 | N/A | ||||
Isobutyl ketone | 8300 | 100 | 0.0903 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.106 | N/A | ||||
Organic acid salts 1 | 8300 | 100 | 0.0902 | N/A | ||||
Organic acid salts 2 | 8300 | 100 | 0.0915 | N/A | ||||
Organic acid salts 3 | 8300 | 100 | 0.0917 | N/A | ||||
Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 3.6777 | N/A | |
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0775 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-02-19 | 2013-03-11 | Groundwater - Non-saline less than or equal to 150m deep | 400 |
2013-02-19 | 2013-02-19 | Recycled Fracturing Water (treated at well site) | 1200 |
2013-02-21 | 2013-02-28 | Recycled Fracturing Water (treated at well site) | 1231 |
2013-02-28 | 2013-03-01 | Recycled Fracturing Water (treated at well site) | 60 |
2013-02-26 | 2013-02-26 | Recycled Fracturing Water (treated at well site) | 30 |
2013-03-01 | 2013-03-11 | Surface Water - River | 902 |
2013-02-19 | 2013-03-10 | Surface Water - River | 466 |
2013-03-01 | 2013-03-10 | Recycled Fracturing Water (treated at well site) | 30 |
2013-02-20 | 2013-02-20 | Recycled Fracturing Water (treated at well site) | 27 |
2013-03-02 | 2013-03-11 | Oilfield Produced Water | 157 |
2013-02-21 | 2013-03-10 | Recycled Fracturing Water (treated at well site) | 417 |
2013-02-21 | 2013-03-03 | Recycled Fracturing Water (treated at well site) | 3038 |
2013-03-01 | 2013-03-08 | Recycled Fracturing Water (treated at well site) | 57 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 3694 | 0.0 | 0.0 | 0.0 |
2014 | 7789 | 0.0 | 0.0 | 0.0 |
2015 | 4782 | 0.0 | 0.0 | 0.0 |
2016 | 3768 | 0.0 | 0.0 | 0.0 |
2017 | 4032 | 0.0 | 0.0 | 0.0 |
2018 | 2376 | 0.0 | 0.0 | 0.0 |
2019 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-02-26 | No Incident Encountered | 0.00 | 0.00 |
2013-03-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]