If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0615272509000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.293875,"lon":-117.870224,"icon":""}]} |
Location: 00/09-25-061-27W5/0 | |
Location Alias: 00/09-25-61-27 W5M | |
Location Alias 2: 00/09-25-061-27 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 5 | |
Range: 27 | |
Section: 25 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CEQUENCE HZ WANYAN 9-25-61-27 | |
Operator Name: Cequence Energy Ltd. | |
License Number: 0440347 | |
License Date: 2011-12-05 | |
License Status: Issued | |
Spud Date: 2012-01-17 | |
Final Drill Date: 2012-02-27 | |
Well Total Depth: 5429.00 m | |
Surface Hole Latitude: 54.293875 | |
Surface Hole Longitude: -117.870224 |
Date | Event |
---|---|
2011-12-05 | Obtained License |
2012-01-20 | Surface Casing Operation Performed |
2012-01-28 | Direction Drilling Operation Performed - Horizontal |
2012-02-04 | Intermediate Casing Operation Performed |
2012-02-04 | Well Log Performed |
2012-02-27 | Finished Drilling |
2012-02-27 | Well Log Performed |
2012-02-27 | Well Mode changed to Drilled and Cased |
2012-02-29 | Well Log Performed |
2012-03-01 | Liner Casing Operation Performed |
2012-03-03 | Rig Released |
2012-03-05 | Perforation Treatment Performed - Open-Hole Completion |
2012-03-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-08 | Well Began Production |
2012-03-08 | Well Fluid changed to Gas |
2012-03-08 | Well Mode changed to Flowing |
2012-03-09 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-17 | Canelson Drilling Inc. | 20 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-28 | 2703.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-03-05 | Open Hole/Barefoot Completion | 5400.40 | 5429.00 | 0 |
2012-03-07 | Multi-Stage Fracture | 4622.00 | 4622.10 | 0 |
2012-03-08 | Multi-Stage Fracture | 4522.80 | 4522.90 | 0 |
2012-03-08 | Multi-Stage Fracture | 4409.10 | 4409.20 | 0 |
2012-03-08 | Multi-Stage Fracture | 4308.60 | 4308.70 | 0 |
2012-03-08 | Multi-Stage Fracture | 4208.10 | 4208.20 | 0 |
2012-03-08 | Multi-Stage Fracture | 4107.70 | 4107.80 | 0 |
2012-03-08 | Multi-Stage Fracture | 4008.60 | 4008.70 | 0 |
2012-03-08 | Multi-Stage Fracture | 3908.30 | 3908.40 | 0 |
2012-03-08 | Multi-Stage Fracture | 3808.60 | 3808.70 | 0 |
2012-03-09 | Multi-Stage Fracture | 3710.10 | 3710.20 | 0 |
2012-03-06 | Multi-Stage Fracture | 5377.30 | 5378.30 | 0 |
2012-03-09 | Multi-Stage Fracture | 3609.60 | 3609.70 | 0 |
2012-03-09 | Multi-Stage Fracture | 3518.10 | 3518.20 | 0 |
2012-03-09 | Multi-Stage Fracture | 3417.90 | 3418.00 | 0 |
2012-03-09 | Multi-Stage Fracture | 3331.00 | 3331.10 | 0 |
2012-03-09 | Multi-Stage Fracture | 3218.10 | 3218.20 | 0 |
2012-03-09 | Multi-Stage Fracture | 3118.90 | 3119.00 | 0 |
2012-03-07 | Multi-Stage Fracture | 5303.90 | 5304.00 | 0 |
2012-03-07 | Multi-Stage Fracture | 5204.10 | 5204.20 | 0 |
2012-03-07 | Multi-Stage Fracture | 5104.40 | 5104.50 | 0 |
2012-03-07 | Multi-Stage Fracture | 5004.70 | 5004.80 | 0 |
2012-03-07 | Multi-Stage Fracture | 4905.10 | 4905.20 | 0 |
2012-03-07 | Multi-Stage Fracture | 4807.10 | 4807.20 | 0 |
2012-03-07 | Multi-Stage Fracture | 4721.10 | 4721.20 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6456 | 0.0 | 0.0 | 0.0 |
2013 | 8519 | 0.0 | 0.0 | 0.0 |
2014 | 8613 | 0.0 | 0.0 | 0.0 |
2015 | 5593 | 0.0 | 0.0 | 0.0 |
2016 | 8520 | 0.0 | 0.0 | 0.0 |
2017 | 6599 | 0.0 | 0.0 | 0.0 |
2018 | 5471 | 0.0 | 0.0 | 0.0 |
2019 | 5064 | 0.0 | 0.0 | 0.0 |
2020 | 1655 | 0.0 | 0.0 | 0.0 |
For data sources see[7]