If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616010607000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.257792,"lon":-118.160502,"icon":""}]} |
Location: 00/07-06-061-01W6/0 | |
Location Alias: 00/07-06-61-01 W6M | |
Location Alias 2: 00/07-06-061-01 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 6 | |
Range: 01 | |
Section: 06 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CEQUENCE 2-12 HZ RESTHA 7-6-61-1 | |
Operator Name: Cequence Energy Ltd. | |
License Number: 0452229 | |
License Date: 2012-12-14 | |
License Status: Amended | |
Spud Date: 2013-01-04 | |
Final Drill Date: 2013-02-07 | |
Well Total Depth: 5136.00 m | |
Surface Hole Latitude: 54.257792 | |
Surface Hole Longitude: -118.160502 |
Date | Event |
---|---|
2012-12-14 | Obtained License |
2013-01-06 | Surface Casing Operation Performed |
2013-01-14 | Direction Drilling Operation Performed - Deviate |
2013-01-18 | Intermediate Casing Operation Performed |
2013-01-19 | Well Log Performed |
2013-01-20 | Direction Drilling Operation Performed - Horizontal |
2013-02-07 | Finished Drilling |
2013-02-07 | Well Log Performed |
2013-02-07 | Well Mode changed to Drilled and Cased |
2013-02-10 | Liner Casing Operation Performed |
2013-02-12 | Rig Released |
2013-02-19 | Perforation Treatment Performed - Open-Hole Completion |
2013-02-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-02-22 | Well Began Production |
2013-02-22 | Well Fluid changed to Gas |
2013-02-22 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2013-01-14 | 2738.60 | Deviate (5 - 79 degrees) |
2013-01-20 | 3055.40 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-02-19 | Open Hole/Barefoot Completion | 5115.80 | 5136.00 | 0 |
2013-02-20 | Multi-Stage Fracture | 4319.10 | 4319.20 | 0 |
2013-02-20 | Multi-Stage Fracture | 4230.90 | 4231.00 | 0 |
2013-02-20 | Multi-Stage Fracture | 3950.80 | 3950.90 | 0 |
2013-02-20 | Multi-Stage Fracture | 3875.50 | 3875.60 | 0 |
2013-02-20 | Multi-Stage Fracture | 3786.10 | 3786.20 | 0 |
2013-02-20 | Multi-Stage Fracture | 3695.60 | 3695.70 | 0 |
2013-02-20 | Multi-Stage Fracture | 3618.90 | 3619.00 | 0 |
2013-02-20 | Multi-Stage Fracture | 3528.10 | 3528.20 | 0 |
2013-02-20 | Multi-Stage Fracture | 3437.40 | 3437.50 | 0 |
2013-02-20 | Multi-Stage Fracture | 3362.80 | 3362.90 | 0 |
2013-02-20 | Multi-Stage Fracture | 5076.20 | 5080.20 | 0 |
2013-02-20 | Multi-Stage Fracture | 4988.50 | 4988.60 | 0 |
2013-02-20 | Multi-Stage Fracture | 4890.50 | 4890.60 | 0 |
2013-02-20 | Multi-Stage Fracture | 4808.30 | 4808.40 | 0 |
2013-02-20 | Multi-Stage Fracture | 4721.20 | 4721.30 | 0 |
2013-02-20 | Multi-Stage Fracture | 4636.00 | 4636.10 | 0 |
2013-02-20 | Multi-Stage Fracture | 4554.50 | 4554.60 | 0 |
2013-02-20 | Multi-Stage Fracture | 4419.90 | 4420.00 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-02-20 | 2013-02-20 | 2,984 | 4,690 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 80.2453 | N/A | |||
30/50 Prime Plus | Calfrac | Quartz | 14808-60-7 | 100 | 1.5775 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 12.6205 | N/A | ||
50/140 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 1.5775 | N/A | ||
Tolcide PS75LT | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0118 | N/A | |
Water | 7732-18-5 | 100 | 0.0122 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0722 | N/A | |
DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0832 | N/A | |
Ethoxylated phenolic resin | 8300 | 100 | 0.0847 | N/A | ||||
Isobutyl ketone | 8300 | 100 | 0.0834 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0935 | N/A | ||||
Organic acid salts 1 | 8300 | 100 | 0.0832 | N/A | ||||
Organic acid salts 2 | 8300 | 100 | 0.0842 | N/A | ||||
Organic acid salts 3 | 8300 | 100 | 0.0847 | N/A | ||||
Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 3.725 | N/A | |
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0874 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-02-13 | 2013-02-20 | Groundwater - Non-saline less than or equal to 150m deep | 250 |
2013-02-10 | 2013-02-10 | Recycled Fracturing Water (treated at well site) | 181 |
2013-02-04 | 2013-02-07 | Recycled Fracturing Water (treated at well site) | 73 |
2013-02-11 | 2013-02-11 | Recycled Fracturing Water (treated at well site) | 20 |
2013-02-10 | 2013-02-10 | Recycled Fracturing Water (treated at well site) | 30 |
2013-02-12 | 2013-02-12 | Recycled Fracturing Water (treated at well site) | 43 |
2013-02-05 | 2013-02-20 | Surface Water - River | 859 |
2013-02-10 | 2013-02-17 | Surface Water - River | 1106 |
2013-02-05 | 2013-02-20 | Recycled Fracturing Water (treated at well site) | 1846 |
2013-02-10 | 2013-02-20 | Recycled Fracturing Water (treated at well site) | 207 |
2013-02-11 | 2013-02-20 | Oilfield Produced Water | 30 |
2013-02-11 | 2013-02-20 | Recycled Fracturing Water (treated at well site) | 45 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 6790 | 0.0 | 0.0 | 0.0 |
2014 | 8735 | 0.0 | 0.0 | 0.0 |
2015 | 7800 | 0.0 | 0.0 | 0.0 |
2016 | 7896 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8663 | 0.0 | 0.0 | 0.0 |
2019 | 8735 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-02-13 | No Incident Encountered | 0.00 | 0.00 |
2013-03-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]