X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616092210000

Well Details

Well ID: 0616092210000
Loading map...
Location: 00/10-22-061-09W6/0
Location Alias: 00/10-22-61-09 W6M
Location Alias 2: 00/10-22-061-09 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 09
Section: 22
County/Municipality: Municipal District of Greenview No. 16
Well Name: KELT EXP LYNX 10-22-61-9
Operator Name: Kelt Exploration Ltd.
License Number: 0279530
License Date: 2002-12-24
License Status: Suspension
Spud Date: 2003-01-23
Final Drill Date: 2003-03-12
Well Total Depth: 3527.00 m
Surface Hole Latitude: 54.297946
Surface Hole Longitude: -119.261227

For data sources see[1][2]

Well History

Date Event
2002-12-24 Obtained License
2003-01-30 Surface Casing Operation Performed
2003-02-05 Direction Drilling Operation Performed - Deviate
2003-02-21 Well Log Performed
2003-02-24 Intermediate Casing Operation Performed
2003-03-03 Drill Stem Test Performed
2003-03-11 Well Log Performed
2003-03-12 Finished Drilling
2003-03-12 Well Mode changed to Drilled and Cased
2003-03-14 Production Casing Operation Performed
2003-03-15 Rig Released
2003-03-29 Perforation Treatment Performed - Jet Perforation
2003-03-29 Well Log Performed
2003-08-02 Perforation Treatment Performed - Jet Perforation
2003-08-02 Well Log Performed
2003-08-07 Perforation Treatment Performed - Fractured
2003-08-13 Well Log Performed
2003-08-14 Perforation Treatment Performed - Jet Perforation
2003-08-17 Perforation Treatment Performed - Jet Perforation
2003-08-17 Well Log Performed
2003-08-21 Perforation Treatment Performed - Fractured
2003-08-31 Well Fluid changed to Gas
2003-08-31 Well Mode changed to Testing
2003-12-31 Well Fluid changed to Gas
2003-12-31 Well Mode changed to Test Completed
2020-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-02-06 Plug Back Performed
2020-02-06 Well Fluid changed to Gas
2020-02-06 Well Log Performed
2020-02-06 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-02-05 1701.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-03-29 Perforation 3473.00 3478.00 17
2003-08-02 Perforation 3468.00 3478.00 17
2003-08-07 Fracture 3468.00 3478.00 0
2003-08-14 Perforation 3491.00 3503.00 17
2003-08-17 Perforation 3148.00 3153.00 17
2003-08-21 Fracture 3148.00 3153.00 0
2020-02-06 Packing Device Capped w/Cement 3131.00 3140.00 0
2020-02-06 Packing Device Capped w/Cement 3451.00 3460.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 79 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-07 No Incident Encountered 0.00 0.00

For data sources see[7]

References