X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524261504000

Well Details

Well ID: 0524261504000
Loading map...
Location: 00/04-15-052-26W4/0
Location Alias: 00/04-15-52-26 W4M
Location Alias 2: 00/04-15-052-26 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 15
County/Municipality: Stony Plain 135
Well Name: CEDAR CREEK GSPIKE 4-15-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0012125
License Date: 1956-08-20
License Status: Abandoned
Spud Date: 1956-08-28
Final Drill Date: 1956-09-21
Well Total Depth: 1563.60 m
Surface Hole Latitude: 53.484540
Surface Hole Longitude: -113.760105

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-08-20 Obtained License
1956-09-04 Drill Stem Test Performed
1956-09-08 Drill Stem Test Performed
1956-09-11 Drill Stem Test Performed
1956-09-17 Drill Stem Test Performed
1956-09-20 Drill Stem Test Performed
1956-09-21 Finished Drilling
1956-09-21 Well Mode changed to Drilled and Cased
1956-09-22 Production Casing Operation Performed
1956-09-24 Perforation Treatment Performed - Open-Hole Completion
1956-10-06 Well Began Production
1956-10-06 Well Fluid changed to Crude Oil
1956-10-06 Well Mode changed to Pumping
1963-03-20 Perforation Treatment Performed - Jet Perforation
1963-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-04-24 Perforation Treatment Performed - Fractured
1963-12-31 Well Fluid changed to Crude Oil
1963-12-31 Well Mode changed to Pumping
1970-05-07 Perforation Treatment Performed - Cement Plug
1970-05-07 Well Fluid changed to Crude Oil
1970-05-07 Well Mode changed to Abandoned Zone
1970-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-05-11 Perforation Treatment Performed - Acid Wash - No Pressure
1970-05-11 Perforation Treatment Performed - Jet Perforation
1987-03-24 Well Log Performed
1987-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-03-25 Plug Back Performed
1987-03-25 Well Log Performed
2002-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-08 Perforation Treatment Performed - Jet Perforation
2002-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-09 Perforation Treatment Performed - Remedial Casing
2002-01-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-10 Perforation Treatment Performed - Jet Perforation
2002-01-10 Perforation Treatment Performed - Remedial Casing
2002-01-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-09-24 Open Hole/Barefoot Completion 1562.40 1563.60 0
1987-03-25 Packing Device Capped w/Cement 1045.00 1050.40 0
2002-01-08 Packing Device Capped w/Cement 1022.00 1030.00 0
2002-01-08 Perforation 515.10 516.10 14
2002-01-09 Remedial Casing Cementing 515.10 516.10 0
2002-01-09 Packing Device Capped w/Cement 504.00 512.00 0
2002-01-10 Perforation 300.20 301.20 14
2002-01-10 Remedial Casing Cementing 300.20 301.20 0
2002-01-10 Packing Device Capped w/Cement 284.00 296.00 0
1963-03-20 Perforation 1033.90 1035.10 7
1963-03-20 Perforation 1040.00 1043.60 7
1963-03-21 Acid Treatment 1033.90 1043.60 0
1963-04-24 Fracture 1033.90 1043.60 0
1970-05-07 Cement Plug 1449.90 1563.60 0
1970-05-11 Perforation 1258.80 1262.50 7
1970-05-11 Acid Wash 1258.80 1262.50 0
1970-05-11 Acid Treatment 1258.80 1262.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7789 0.0 0.0 0.0
1968 8135 0.0 0.0 0.0
1969 8447 0.0 0.0 0.0
1970 144 0.0 0.0 0.0

For data sources see[5]

References