X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524262004040

Well Details

Well ID: 0524262004040
Loading map...
Location: 04/04-20-052-26W4/0
Location Alias: 04/04-20-52-26 W4M
Location Alias 2: 04/04-20-052-26 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 20
County/Municipality: Stony Plain 135
Well Name: CEDAR CREEK ACH 4-20-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0214620
License Date: 1998-04-09
License Status: Issued
Spud Date: 1998-04-23
Final Drill Date: 1998-04-28
Well Total Depth: 1414.00 m
Surface Hole Latitude: 53.497989
Surface Hole Longitude: -113.806473

For data sources see[1][2]

Well History

Date Event
1998-04-09 Obtained License
1998-04-24 Surface Casing Operation Performed
1998-04-28 Finished Drilling
1998-04-28 Well Log Performed
1998-04-29 Production Casing Operation Performed
1998-04-29 Rig Released
1998-04-29 Well Mode changed to Drilled and Cased
1998-05-03 Perforation Treatment Performed - Jet Perforation
1998-06-03 Well Log Performed
1998-06-04 Perforation Treatment Performed - Jet Perforation
1998-06-04 Well Log Performed
1998-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-06-08 Plug Back Performed
1998-06-09 Perforation Treatment Performed - Jet Perforation
1998-08-27 Well Log Performed
2000-03-16 Well Began Production
2000-03-16 Well Fluid changed to Gas
2000-03-16 Well Mode changed to Flowing
2003-06-01 Perforation Treatment Performed - Jet Perforation
2005-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-02-09 Perforation Treatment Performed - Chemical Squeeze
2006-04-26 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-05-03 Perforation 1384.60 1387.00 14
1998-06-04 Perforation 1382.00 1383.50 14
1998-06-05 Acid Treatment 1382.00 1383.50 0
1998-06-08 Packing Device Capped w/Cement 1372.00 1380.00 0
1998-06-09 Perforation 1296.00 1297.00 20
2003-06-01 Perforation 1297.00 1299.00 13
2005-07-05 Acid Treatment 1296.00 1299.00 0
2006-02-09 Chemical Squeeze 1296.00 1299.00 0
2006-04-26 Acid Treatment 1296.00 1299.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 6469 0.0 0.0 0.0
2001 8502 0.0 0.0 0.0
2002 8157 0.0 0.0 0.0
2003 6365 0.0 0.0 0.0
2004 4655 0.0 0.0 0.0
2005 3773 0.0 0.0 0.0
2006 5776 0.0 0.0 0.0
2007 8361 0.0 0.0 0.0
2008 7373 0.0 0.0 0.0
2009 8562 0.0 0.0 0.0
2010 8085 0.0 0.0 0.0
2011 8255 0.0 0.0 0.0
2012 7129 0.0 0.0 0.0
2013 8327 0.0 0.0 0.0
2014 8535 0.0 0.0 0.0
2015 8289 0.0 0.0 0.0
2016 6406 0.0 0.0 0.0
2017 5061 0.0 0.0 0.0
2018 8518 0.0 0.0 0.0
2019 8538 0.0 0.0 0.0
2020 2162 0.0 0.0 0.0

For data sources see[5]

References