If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0524262211000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.506382,"lon":-113.753514,"icon":""}]} |
Location: 00/11-22-052-26W4/0 | |
Location Alias: 00/11-22-52-26 W4M | |
Location Alias 2: 00/11-22-052-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 4 | |
Range: 26 | |
Section: 22 | |
County/Municipality: Stony Plain 135 | |
Well Name: IMPERIAL STONY PLAIN NO 3 | |
Operator Name: Imperial Oil Limited | |
License Number: 0002517 | |
License Date: 1951-01-09 | |
License Status: RecExempt | |
Spud Date: 1951-01-11 | |
Final Drill Date: 1951-02-21 | |
Well Total Depth: 1652.00 m | |
Surface Hole Latitude: 53.506382 | |
Surface Hole Longitude: -113.753514 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1951-01-09 | Obtained License |
1951-01-20 | Drill Stem Test Performed |
1951-01-22 | Drill Stem Test Performed |
1951-01-26 | Drill Stem Test Performed |
1951-01-30 | Drill Stem Test Performed |
1951-02-02 | Drill Stem Test Performed |
1951-02-03 | Drill Stem Test Performed |
1951-02-04 | Drill Stem Test Performed |
1951-02-05 | Drill Stem Test Performed |
1951-02-14 | Drill Stem Test Performed |
1951-02-15 | Drill Stem Test Performed |
1951-02-16 | Drill Stem Test Performed |
1951-02-19 | Drill Stem Test Performed |
1951-02-21 | Finished Drilling |
1951-02-21 | Production Casing Operation Performed |
1951-02-21 | Well Mode changed to Drilled and Cased |
1951-02-25 | Perforation Treatment Performed - Bullet Perforation |
1951-02-26 | Drill Stem Test Performed |
1951-02-26 | Perforation Treatment Performed - Jet Perforation |
1951-02-27 | Drill Stem Test Performed |
1951-06-30 | Perforation Treatment Performed - Cement Squeeze |
1951-07-13 | Perforation Treatment Performed - Jet Perforation |
1951-07-15 | Perforation Treatment Performed - Jet Perforation |
1951-07-16 | Drill Stem Test Performed |
1951-07-18 | Drill Stem Test Performed |
1951-07-19 | Perforation Treatment Performed - Cement Squeeze |
1951-07-24 | Perforation Treatment Performed - Jet Perforation |
1951-07-25 | Drill Stem Test Performed |
1951-07-31 | Perforation Treatment Performed - Jet Perforation |
1951-08-13 | Well Began Production |
1951-08-13 | Well Fluid changed to Crude Oil |
1951-08-13 | Well Mode changed to Pumping |
1953-03-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1953-03-08 | Perforation Treatment Performed - Cement Squeeze |
1953-03-12 | Perforation Treatment Performed - Cement Plug |
1953-03-12 | Perforation Treatment Performed - Jet Perforation |
1953-05-18 | Well Abandoned |
1953-05-18 | Well Fluid changed to Crude Oil |
1953-05-18 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1951-02-25 | Bullet Perforation | 1252.70 | 1269.80 | 13 |
1951-07-15 | Perforation | 1267.40 | 1269.20 | 13 |
1951-07-19 | Cement Squeeze | 1267.40 | 1274.40 | 0 |
1951-07-24 | Perforation | 1250.60 | 1252.70 | 13 |
1951-07-24 | Perforation | 1253.90 | 1254.90 | 13 |
1951-07-31 | Perforation | 1250.30 | 1252.10 | 13 |
1951-07-31 | Perforation | 1258.80 | 1259.40 | 13 |
1951-07-31 | Perforation | 1260.70 | 1261.60 | 13 |
1953-03-08 | Acid Treatment | 1250.30 | 1261.60 | 0 |
1953-03-08 | Cement Squeeze | 1250.30 | 1261.60 | 0 |
1953-03-12 | Perforation | 1256.40 | 1257.90 | 13 |
1951-02-25 | Bullet Perforation | 1254.30 | 1254.60 | 13 |
1953-03-12 | Cement Plug | 1228.60 | 1254.60 | 0 |
1951-02-25 | Bullet Perforation | 1258.80 | 1259.40 | 13 |
1951-02-26 | Perforation | 1267.70 | 1269.20 | 13 |
1951-02-26 | Perforation | 1270.10 | 1271.00 | 13 |
1951-02-26 | Perforation | 1271.90 | 1274.40 | 13 |
1951-06-30 | Cement Squeeze | 1254.30 | 1259.40 | 0 |
1951-07-13 | Perforation | 1258.80 | 1259.40 | 13 |
1951-07-15 | Perforation | 1258.80 | 1259.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]