X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524262211000

Well Details

Well ID: 0524262211000
Loading map...
Location: 00/11-22-052-26W4/0
Location Alias: 00/11-22-52-26 W4M
Location Alias 2: 00/11-22-052-26 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 22
County/Municipality: Stony Plain 135
Well Name: IMPERIAL STONY PLAIN NO 3
Operator Name: Imperial Oil Limited
License Number: 0002517
License Date: 1951-01-09
License Status: RecExempt
Spud Date: 1951-01-11
Final Drill Date: 1951-02-21
Well Total Depth: 1652.00 m
Surface Hole Latitude: 53.506382
Surface Hole Longitude: -113.753514

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-01-09 Obtained License
1951-01-20 Drill Stem Test Performed
1951-01-22 Drill Stem Test Performed
1951-01-26 Drill Stem Test Performed
1951-01-30 Drill Stem Test Performed
1951-02-02 Drill Stem Test Performed
1951-02-03 Drill Stem Test Performed
1951-02-04 Drill Stem Test Performed
1951-02-05 Drill Stem Test Performed
1951-02-14 Drill Stem Test Performed
1951-02-15 Drill Stem Test Performed
1951-02-16 Drill Stem Test Performed
1951-02-19 Drill Stem Test Performed
1951-02-21 Finished Drilling
1951-02-21 Production Casing Operation Performed
1951-02-21 Well Mode changed to Drilled and Cased
1951-02-25 Perforation Treatment Performed - Bullet Perforation
1951-02-26 Drill Stem Test Performed
1951-02-26 Perforation Treatment Performed - Jet Perforation
1951-02-27 Drill Stem Test Performed
1951-06-30 Perforation Treatment Performed - Cement Squeeze
1951-07-13 Perforation Treatment Performed - Jet Perforation
1951-07-15 Perforation Treatment Performed - Jet Perforation
1951-07-16 Drill Stem Test Performed
1951-07-18 Drill Stem Test Performed
1951-07-19 Perforation Treatment Performed - Cement Squeeze
1951-07-24 Perforation Treatment Performed - Jet Perforation
1951-07-25 Drill Stem Test Performed
1951-07-31 Perforation Treatment Performed - Jet Perforation
1951-08-13 Well Began Production
1951-08-13 Well Fluid changed to Crude Oil
1951-08-13 Well Mode changed to Pumping
1953-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-03-08 Perforation Treatment Performed - Cement Squeeze
1953-03-12 Perforation Treatment Performed - Cement Plug
1953-03-12 Perforation Treatment Performed - Jet Perforation
1953-05-18 Well Abandoned
1953-05-18 Well Fluid changed to Crude Oil
1953-05-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-02-25 Bullet Perforation 1252.70 1269.80 13
1951-07-15 Perforation 1267.40 1269.20 13
1951-07-19 Cement Squeeze 1267.40 1274.40 0
1951-07-24 Perforation 1250.60 1252.70 13
1951-07-24 Perforation 1253.90 1254.90 13
1951-07-31 Perforation 1250.30 1252.10 13
1951-07-31 Perforation 1258.80 1259.40 13
1951-07-31 Perforation 1260.70 1261.60 13
1953-03-08 Acid Treatment 1250.30 1261.60 0
1953-03-08 Cement Squeeze 1250.30 1261.60 0
1953-03-12 Perforation 1256.40 1257.90 13
1951-02-25 Bullet Perforation 1254.30 1254.60 13
1953-03-12 Cement Plug 1228.60 1254.60 0
1951-02-25 Bullet Perforation 1258.80 1259.40 13
1951-02-26 Perforation 1267.70 1269.20 13
1951-02-26 Perforation 1270.10 1271.00 13
1951-02-26 Perforation 1271.90 1274.40 13
1951-06-30 Cement Squeeze 1254.30 1259.40 0
1951-07-13 Perforation 1258.80 1259.40 13
1951-07-15 Perforation 1258.80 1259.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References