X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524263601000

Well Details

Well ID: 0524263601000
Loading map...
Location: 00/01-36-052-26W4/0
Location Alias: 00/01-36-52-26 W4M
Location Alias 2: 00/01-36-052-26 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 36
County/Municipality: Edmonton
Well Name: CEDAR CREEK ACHE 1-36-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0144713
License Date: 1990-07-06
License Status: Suspension
Spud Date: 1990-07-24
Final Drill Date: 1990-08-03
Well Total Depth: 1452.00 m
Surface Hole Latitude: 53.528871
Surface Hole Longitude: -113.698968

For data sources see[1][2]

Well History

Date Event
1990-07-06 Obtained License
1990-07-25 Surface Casing Operation Performed
1990-07-26 Direction Drilling Operation Performed - Deviate
1990-08-03 Finished Drilling
1990-08-03 Well Mode changed to Drilled and Cased
1990-08-05 Production Casing Operation Performed
1990-08-05 Well Log Performed
1990-08-06 Rig Released
1990-08-11 Perforation Treatment Performed - Jet Perforation
1990-08-14 Well Log Performed
1990-08-16 Well Began Production
1990-08-16 Well Fluid changed to Crude Oil
1990-08-16 Well Mode changed to Pumping
2000-01-19 Well Fluid changed to Crude Oil
2000-01-19 Well Mode changed to Closed
2000-08-09 Well Fluid changed to Crude Oil
2000-08-09 Well Mode changed to Pumping
2001-04-20 Perforation Treatment Performed - Jet Perforation
2001-04-20 Well Log Performed
2006-01-28 Perforation Treatment Performed - Jet Perforation
2006-01-29 Perforation Treatment Performed - Jet Perforation
2006-01-30 Perforation Treatment Performed - Fractured
2006-01-31 Perforation Treatment Performed - Fractured
2006-02-02 Perforation Treatment Performed - Fractured
2006-06-26 Well Fluid changed to Crude Oil
2006-06-26 Well Mode changed to Suspended
2006-11-08 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-07-26 231.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-08-11 Perforation 1392.00 1395.00 13
2006-02-02 Fracture 1377.50 1381.50 0
2006-11-08 Cement Squeeze 1377.50 1414.00 0
2001-04-20 Perforation 1385.30 1388.30 14
2001-04-20 Perforation 1392.00 1398.00 14
2006-01-28 Perforation 1410.00 1414.00 20
2006-01-29 Perforation 1404.50 1408.50 20
2006-01-29 Perforation 1392.00 1396.00 20
2006-01-29 Perforation 1377.50 1381.50 20
2006-01-30 Fracture 1404.50 1408.50 0
2006-01-31 Fracture 1392.00 1396.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 3274 0.0 0.0 0.0
1991 8599 0.0 0.0 0.0
1992 8444 0.0 0.0 0.0
1993 8747 0.0 0.0 0.0
1994 8375 0.0 0.0 0.0
1995 8567 0.0 0.0 0.0
1996 7939 0.0 0.0 0.0
1997 8597 0.0 0.0 0.0
1998 8735 0.0 0.0 0.0
1999 5087 0.0 0.0 0.0
2000 3435 0.0 0.0 0.0
2001 8352 0.0 0.0 0.0
2002 3690 0.0 0.0 0.0

For data sources see[6]

References