Well ID: 37-129-28566 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.282472,"lon":-79.476638,"icon":""}]} |
Operator Name: KRIEBEL MINERALS INC | |
First Permit Date: 2011-03-21 | |
Last Permit Date: 2011-03-21 | |
Spud Date: 2012-01-23 | |
Unconventional: No | |
Horizontal: No | |
Violations: 1 | |
Latitude: 40.282472 | |
Longitude: -79.476638 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 9350.0 | 324.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 8448.0 | 273.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-0 | DRILLING FLUID WASTE | 50.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2012-0 | FRACING FLUID WASTE | 300.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2012-0 | FRACING FLUID WASTE | 714.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2012-0 | DRILLING FLUID WASTE | 440.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2012-0 | DRILLING FLUID WASTE | 50.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2012-0 | FRACING FLUID WASTE | 300.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2012-0 | FRACING FLUID WASTE | 714.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2012-0 | DRILLING FLUID WASTE | 440.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2036881 | 2012-01-24 | Violation(s) Noted | There was the following violations on this site:
1. The onsite E&S site plan lists the watershed as High Quality(HQ) coldwater fishery. When constructing a site in a HQ watershed, ABAC BMPs need to be installed. On the toe of slope, sediment fencing was used. This is inadequate for a BMP in this watershed. 2. Stakes for the safety fencing were driven through the plastic pit liner. This comprimises the integrity of the pit liner. (Also, due to the holes in the liner, the pit can no longer be encapsulated.) 3. There was a small ditch that was dug from the well head to the pit. Contaminated material was evident in this unlined ditch. 4. There was no freeboard in the open tank, and no overflow system to a standby tank or pit. |
630357 |
2036881 | 2012-01-24 | Violation(s) Noted | There was the following violations on this site:
1. The onsite E&S site plan lists the watershed as High Quality(HQ) coldwater fishery. When constructing a site in a HQ watershed, ABAC BMPs need to be installed. On the toe of slope, sediment fencing was used. This is inadequate for a BMP in this watershed. 2. Stakes for the safety fencing were driven through the plastic pit liner. This comprimises the integrity of the pit liner. (Also, due to the holes in the liner, the pit can no longer be encapsulated.) 3. There was a small ditch that was dug from the well head to the pit. Contaminated material was evident in this unlined ditch. 4. There was no freeboard in the open tank, and no overflow system to a standby tank or pit. |
630357 |
2037057 | 2012-01-24 | No Violations Noted | US Energy rig 3 drilling on Kriebel pad G. Masarik 1, depth of 700', drilling 8 7/8" hole.
Proposed TD 3930' Date spudded 1/23/2012 |
|
2051584 | 2012-03-19 | No Violations Noted | Site visit was a compliance evaluation for the 279830 violation on 1-24-12.
Well was in production. Pit was removed. The fill slope was regraded and showed potential for E&S issues. Recent excavated areas were not seeded nor mulched. No further violations noted at this time. |