If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 47-095-01917 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.463539,"lon":-80.644838,"icon":""}]} |
Country: United States | |
State: West Virginia | |
County: Tyler | |
Operator Name: Commonwealth Energy, Inc. | |
Farm/Lease Name: Commonwealth Energy Inc | |
License Status: Completed | |
License Date: | |
Spud Date: 2007-01-01 | |
Final Drill Date: 2009-07-16 | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 39.463539 | |
Longitude: -80.644838 |
Job Completed | Job Completion Date | Comment |
---|---|---|
Original Location Drilled | 2009-07-16 | Permit was cancelled in error. The well was completed and report filed by Joe Taylor. Revised plat in batch Feb 11 2011. All gas from Benson and Riley was natural. Marcellus not yet treated. |
For data sources see[2]
Period | Operator Name | Waste Type | Quantity | Quantity Units | Production Days |
---|---|---|---|---|---|
2006 | Commonwealth Energy, Inc. | Water | Gallons |