If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244271903002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.053908,"lon":-113.763372,"icon":""}]} |
Location: 00/03-19-024-27W4/2 | |
Location Alias: 00/03-19-24-27 W4M | |
Location Alias 2: 00/03-19-024-27 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 27 | |
Section: 19 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 3-19-24-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0339827 | |
License Date: 2005-10-12 | |
License Status: Issued | |
Spud Date: 2005-12-07 | |
Final Drill Date: 2006-01-04 | |
Well Total Depth: 899.00 m | |
Surface Hole Latitude: 51.053908 | |
Surface Hole Longitude: -113.763372 |
Date | Event |
---|---|
2005-10-12 | Obtained License |
2005-12-07 | Surface Casing Operation Performed |
2006-01-04 | Finished Drilling |
2006-01-04 | Production Casing Operation Performed |
2006-01-04 | Rig Released |
2006-01-04 | Well Mode changed to Drilled and Cased |
2006-01-10 | Well Log Performed |
2006-02-08 | Perforation Treatment Performed - Jet Perforation |
2010-01-27 | Perforation Treatment Performed - Jet Perforation |
2010-02-08 | Perforation Treatment Performed - Fractured |
2010-02-12 | Well Fluid changed to Gas |
2010-02-12 | Well Mode changed to Testing |
2010-02-26 | Well Began Production |
2010-02-26 | Well Fluid changed to Gas |
2010-02-26 | Well Mode changed to Flowing |
2011-01-17 | Perforation Treatment Performed - Jet Perforation |
2011-01-21 | Perforation Treatment Performed - Fractured |
2011-01-28 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-01-28 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-02-08 | Perforation | 721.00 | 723.00 | 13 |
2011-01-17 | Perforation | 458.50 | 460.50 | 13 |
2011-01-17 | Perforation | 603.80 | 604.30 | 13 |
2011-01-17 | Perforation | 599.30 | 599.80 | 13 |
2011-01-17 | Perforation | 593.90 | 594.90 | 13 |
2011-01-17 | Perforation | 349.00 | 350.00 | 13 |
2011-01-17 | Perforation | 305.00 | 307.00 | 13 |
2011-01-17 | Perforation | 272.00 | 275.00 | 13 |
2011-01-17 | Perforation | 395.90 | 396.40 | 13 |
2011-01-17 | Perforation | 572.00 | 573.00 | 13 |
2011-01-17 | Perforation | 505.50 | 506.50 | 13 |
2010-01-27 | Perforation | 830.00 | 831.00 | 13 |
2011-01-17 | Perforation | 741.70 | 742.20 | 13 |
2011-01-17 | Perforation | 736.40 | 736.90 | 13 |
2011-01-17 | Perforation | 712.60 | 713.60 | 13 |
2011-01-17 | Perforation | 771.60 | 772.10 | 13 |
2011-01-17 | Perforation | 752.90 | 753.40 | 13 |
2011-01-17 | Perforation | 751.50 | 752.00 | 13 |
2011-01-17 | Perforation | 637.20 | 638.20 | 13 |
2011-01-17 | Perforation | 632.40 | 632.90 | 13 |
2011-01-17 | Perforation | 627.70 | 628.20 | 13 |
2011-01-17 | Perforation | 653.80 | 654.30 | 13 |
2010-01-27 | Perforation | 691.00 | 692.00 | 13 |
2011-01-17 | Perforation | 711.80 | 712.30 | 13 |
2011-01-17 | Perforation | 654.80 | 655.80 | 13 |
2011-01-21 | Fracture | 272.00 | 573.00 | 0 |
2011-01-21 | Fracture | 395.90 | 772.10 | 0 |
2010-01-27 | Perforation | 683.50 | 684.50 | 13 |
2010-02-08 | Fracture | 830.00 | 831.00 | 0 |
2010-02-08 | Fracture | 691.00 | 692.00 | 0 |
2010-02-08 | Fracture | 683.50 | 684.50 | 0 |
2011-01-17 | Perforation | 482.60 | 483.60 | 13 |
2011-01-17 | Perforation | 463.90 | 464.90 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 7443 | 0.0 | 0.0 | 0.0 |
2011 | 8255 | 0.0 | 0.0 | 0.0 |
2012 | 4102 | 0.0 | 0.0 | 0.0 |
2013 | 8743 | 0.0 | 0.0 | 0.0 |
2014 | 8654 | 0.0 | 0.0 | 0.0 |
2015 | 8707 | 0.0 | 0.0 | 0.0 |
2016 | 8719 | 0.0 | 0.0 | 0.0 |
2017 | 8667 | 0.0 | 0.0 | 0.0 |
2018 | 8559 | 0.0 | 0.0 | 0.0 |
2019 | 8686 | 0.0 | 0.0 | 0.0 |
2020 | 2158 | 0.0 | 0.0 | 0.0 |
For data sources see[5]