If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264253116000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.267306,"lon":-113.470676,"icon":""}]} |
Location: 00/16-31-026-25W4/0 | |
Location Alias: 00/16-31-26-25 W4M | |
Location Alias 2: 00/16-31-026-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 25 | |
Section: 31 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 16-31-26-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0223754 | |
License Date: 1999-06-18 | |
License Status: Issued | |
Spud Date: 1999-07-12 | |
Final Drill Date: 1999-07-13 | |
Well Total Depth: 748.00 m | |
Surface Hole Latitude: 51.267306 | |
Surface Hole Longitude: -113.470676 |
Date | Event |
---|---|
1999-06-18 | Obtained License |
1999-07-12 | Surface Casing Operation Performed |
1999-07-13 | Finished Drilling |
1999-07-13 | Production Casing Operation Performed |
1999-07-13 | Rig Released |
1999-07-13 | Well Mode changed to Drilled and Cased |
1999-07-24 | Well Log Performed |
1999-07-29 | Perforation Treatment Performed - Jet Perforation |
1999-07-29 | Well Log Performed |
1999-08-19 | Perforation Treatment Performed - Jet Perforation |
1999-08-19 | Well Log Performed |
1999-08-27 | Perforation Treatment Performed - Jet Perforation |
1999-08-27 | Well Log Performed |
1999-10-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-10-26 | Perforation Treatment Performed - Jet Perforation |
1999-10-26 | Plug Back Performed |
1999-10-26 | Well Log Performed |
2000-05-29 | Perforation Treatment Performed - Fractured |
2002-01-27 | Well Began Production |
2002-01-27 | Well Fluid changed to Gas |
2002-01-27 | Well Mode changed to Flowing |
2018-10-26 | Perforation Treatment Performed - Jet Perforation |
2018-10-26 | Well Log Performed |
2018-11-03 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-07-29 | Perforation | 681.00 | 685.00 | 14 |
2018-10-26 | Perforation | 381.50 | 385.00 | 13 |
2018-10-26 | Perforation | 392.00 | 394.00 | 13 |
2018-10-26 | Perforation | 416.00 | 417.00 | 13 |
2018-10-26 | Perforation | 433.80 | 434.80 | 13 |
2018-10-26 | Perforation | 436.60 | 437.60 | 13 |
2018-10-26 | Perforation | 440.90 | 441.90 | 13 |
2018-10-26 | Perforation | 447.00 | 448.00 | 13 |
2018-10-26 | Perforation | 451.10 | 452.10 | 13 |
2018-10-26 | Perforation | 468.90 | 469.90 | 13 |
2018-10-26 | Perforation | 484.60 | 486.10 | 13 |
1999-08-19 | Perforation | 689.00 | 693.00 | 13 |
2018-10-26 | Perforation | 489.50 | 492.50 | 13 |
2018-10-26 | Perforation | 529.60 | 530.60 | 13 |
2018-10-26 | Perforation | 535.20 | 536.20 | 13 |
2018-10-26 | Perforation | 543.40 | 544.40 | 13 |
2018-10-26 | Perforation | 552.50 | 553.50 | 13 |
2018-10-26 | Perforation | 558.00 | 559.00 | 13 |
2018-10-26 | Perforation | 564.50 | 565.50 | 13 |
2018-10-26 | Perforation | 604.20 | 605.20 | 13 |
2018-10-26 | Perforation | 608.10 | 609.10 | 13 |
2018-10-26 | Perforation | 610.00 | 611.00 | 13 |
1999-08-27 | Perforation | 654.00 | 658.00 | 14 |
2018-11-03 | Fracture | 310.60 | 311.60 | 0 |
2018-11-03 | Fracture | 317.00 | 318.00 | 0 |
2018-11-03 | Fracture | 338.00 | 340.00 | 0 |
2018-11-03 | Fracture | 381.50 | 385.00 | 0 |
2018-11-03 | Fracture | 392.00 | 394.00 | 0 |
2018-11-03 | Fracture | 416.00 | 417.00 | 0 |
2018-11-03 | Fracture | 433.80 | 434.80 | 0 |
2018-11-03 | Fracture | 436.60 | 437.60 | 0 |
2018-11-03 | Fracture | 440.90 | 441.90 | 0 |
2018-11-03 | Fracture | 447.00 | 448.00 | 0 |
1999-10-26 | Packing Device Capped w/Cement | 642.00 | 650.00 | 0 |
2018-11-03 | Fracture | 451.10 | 452.10 | 0 |
2018-11-03 | Fracture | 468.90 | 469.90 | 0 |
2018-11-03 | Fracture | 484.60 | 486.10 | 0 |
2018-11-03 | Fracture | 489.50 | 492.50 | 0 |
2018-11-03 | Fracture | 529.60 | 530.60 | 0 |
2018-11-03 | Fracture | 535.20 | 536.20 | 0 |
2018-11-03 | Fracture | 543.40 | 544.40 | 0 |
2018-11-03 | Fracture | 552.50 | 553.50 | 0 |
2018-11-03 | Fracture | 558.00 | 559.00 | 0 |
2018-11-03 | Fracture | 564.50 | 565.50 | 0 |
1999-10-26 | Perforation | 515.00 | 519.00 | 13 |
2018-11-03 | Fracture | 604.20 | 605.20 | 0 |
2018-11-03 | Fracture | 608.10 | 609.10 | 0 |
2018-11-03 | Fracture | 610.00 | 611.00 | 0 |
2000-05-29 | Fracture | 515.00 | 519.00 | 0 |
2018-10-26 | Perforation | 310.60 | 311.60 | 13 |
2018-10-26 | Perforation | 317.00 | 318.00 | 13 |
2018-10-26 | Perforation | 338.00 | 340.00 | 13 |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-11-03 | 2018-11-03 | N/A | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 100 | N/A |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2002 | 8059 | 0.0 | 0.0 | 0.0 |
2003 | 8660 | 0.0 | 0.0 | 0.0 |
2004 | 8783 | 0.0 | 0.0 | 0.0 |
2005 | 8752 | 0.0 | 0.0 | 0.0 |
2006 | 8751 | 0.0 | 0.0 | 0.0 |
2007 | 8724 | 0.0 | 0.0 | 0.0 |
2008 | 8675 | 0.0 | 0.0 | 0.0 |
2009 | 8361 | 0.0 | 0.0 | 0.0 |
2010 | 8638 | 0.0 | 0.0 | 0.0 |
2011 | 8328 | 0.0 | 0.0 | 0.0 |
2012 | 4824 | 0.0 | 0.0 | 0.0 |
2013 | 8638 | 0.0 | 0.0 | 0.0 |
2014 | 8606 | 0.0 | 0.0 | 0.0 |
2015 | 8746 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8231 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2000-05-29 | No Incident Encountered | 0.00 | 0.00 |
2018-11-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]