If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0265031307000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.211778,"lon":-114.254462,"icon":""}]} |
Location: 00/07-13-026-03W5/0 | |
Location Alias: 00/07-13-26-03 W5M | |
Location Alias 2: 00/07-13-026-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 5 | |
Range: 03 | |
Section: 13 | |
County/Municipality: Rocky View County | |
Well Name: RIDGEBACK HZ LOCHEND 7-13-26-3 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0494109 | |
License Date: 2019-04-02 | |
License Status: Amended | |
Spud Date: 2019-10-30 | |
Final Drill Date: 2019-11-09 | |
Well Total Depth: 4570.00 m | |
Surface Hole Latitude: 51.211778 | |
Surface Hole Longitude: -114.254462 |
Date | Event |
---|---|
2019-04-02 | Obtained License |
2019-10-30 | Drill To LD |
2019-10-31 | Surface Casing Operation Performed |
2019-11-01 | Direction Drilling Operation Performed - Deviate |
2019-11-03 | Direction Drilling Operation Performed - Horizontal |
2019-11-05 | Well Log Performed |
2019-11-06 | Well Log Performed |
2019-11-09 | Finished Drilling |
2019-11-09 | Well Mode changed to Drilled and Cased |
2019-11-10 | Production Casing Operation Performed |
2019-11-11 | Rig Released |
2019-12-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-12-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-12-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2020-01-11 | Well Began Production |
2020-01-11 | Well Fluid changed to Crude Oil |
2020-01-11 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-10-30 | Horizon Drilling Inc. | 23 | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-11-01 | 1127.50 | Deviate (5 - 79 degrees) |
2019-11-03 | 2325.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-12-05 | Multi-Stage Fracture | 4480.30 | 4480.40 | 0 |
2019-12-06 | Multi-Stage Fracture | 4027.60 | 4027.70 | 0 |
2019-12-06 | Multi-Stage Fracture | 3986.10 | 3986.20 | 0 |
2019-12-06 | Multi-Stage Fracture | 3931.30 | 3931.40 | 0 |
2019-12-06 | Multi-Stage Fracture | 3889.80 | 3889.90 | 0 |
2019-12-06 | Multi-Stage Fracture | 3835.30 | 3835.40 | 0 |
2019-12-06 | Multi-Stage Fracture | 3780.30 | 3780.40 | 0 |
2019-12-06 | Multi-Stage Fracture | 3739.90 | 3740.00 | 0 |
2019-12-06 | Multi-Stage Fracture | 3685.30 | 3685.40 | 0 |
2019-12-06 | Multi-Stage Fracture | 3630.40 | 3630.50 | 0 |
2019-12-06 | Multi-Stage Fracture | 3588.90 | 3589.00 | 0 |
2019-12-05 | Multi-Stage Fracture | 4438.80 | 4438.90 | 0 |
2019-12-06 | Multi-Stage Fracture | 3533.70 | 3533.80 | 0 |
2019-12-06 | Multi-Stage Fracture | 3478.90 | 3479.00 | 0 |
2019-12-06 | Multi-Stage Fracture | 3437.80 | 3437.90 | 0 |
2019-12-06 | Multi-Stage Fracture | 3383.10 | 3383.20 | 0 |
2019-12-06 | Multi-Stage Fracture | 3328.10 | 3328.20 | 0 |
2019-12-06 | Multi-Stage Fracture | 3286.90 | 3287.00 | 0 |
2019-12-06 | Multi-Stage Fracture | 3233.20 | 3233.30 | 0 |
2019-12-06 | Multi-Stage Fracture | 3180.10 | 3180.20 | 0 |
2019-12-06 | Multi-Stage Fracture | 3138.50 | 3138.60 | 0 |
2019-12-06 | Multi-Stage Fracture | 3084.30 | 3084.40 | 0 |
2019-12-06 | Multi-Stage Fracture | 4383.70 | 4383.80 | 0 |
2019-12-06 | Multi-Stage Fracture | 3029.70 | 3029.80 | 0 |
2019-12-07 | Multi-Stage Fracture | 2988.30 | 2988.40 | 0 |
2019-12-07 | Multi-Stage Fracture | 2933.50 | 2933.60 | 0 |
2019-12-07 | Multi-Stage Fracture | 2879.80 | 2879.90 | 0 |
2019-12-07 | Multi-Stage Fracture | 2596.00 | 2596.10 | 0 |
2019-12-07 | Multi-Stage Fracture | 2556.90 | 2557.00 | 0 |
2019-12-07 | Multi-Stage Fracture | 2517.90 | 2518.00 | 0 |
2019-12-07 | Multi-Stage Fracture | 2477.10 | 2477.20 | 0 |
2019-12-07 | Multi-Stage Fracture | 2435.50 | 2435.60 | 0 |
2019-12-07 | Multi-Stage Fracture | 2394.80 | 2394.90 | 0 |
2019-12-06 | Multi-Stage Fracture | 4328.70 | 4328.80 | 0 |
2019-12-07 | Multi-Stage Fracture | 2366.90 | 2367.00 | 0 |
2019-12-06 | Multi-Stage Fracture | 4287.00 | 4287.10 | 0 |
2019-12-06 | Multi-Stage Fracture | 4231.60 | 4231.70 | 0 |
2019-12-06 | Multi-Stage Fracture | 4190.30 | 4190.40 | 0 |
2019-12-06 | Multi-Stage Fracture | 4135.90 | 4136.00 | 0 |
2019-12-06 | Multi-Stage Fracture | 4081.40 | 4081.50 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-12-05 | 2019-12-07 | 2,138 | 5,010 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric Acid | 7647-01-0 | 100 | 1.3889 | N/A | |||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 1.3279 | N/A | ||||
Water | 7732-18-5 | 100 | 94.5644 | N/A | ||||
40/70 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 7.9996 | N/A | ||
ELECIDE - 2L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.0099 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0099 | N/A | ||||
ELEBR-4 | Element | Breaker | Ammonium persulfate | 7727-54-0 | 100 | 0.0099 | N/A | |
ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.0924 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0924 | N/A | ||||
ELEFR-3A | Element | Friction Reducer | Non-hazardous Ingredients | Not Available | 100 | 0.0075 | N/A | |
Tergitol 15-S-20 | 68131-40-8 | 100 | 0.0075 | N/A | ||||
ELEHV-3 | Element | Friction Reducer | Hydrotreated light paraffinic distillate | 64742-55-8 | 100 | 0.0471 | N/A | |
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0471 | N/A | ||||
ELEFE-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.0924 | N/A | |
Methanol | 67-56-1 | 100 | 0.0924 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0924 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-11-21 | 2019-12-06 | Surface Water - Lake | 7684 |
2019-12-04 | 2019-12-04 | Central Water Distribution Facility | 48 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2020 | 1824 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-11-11 | No Incident Encountered | 0.00 | 0.00 |
2019-12-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]