X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274271311000

Well Details

Well ID: 0274271311000
Loading map...
Location: 00/11-13-027-27W4/0
Location Alias: 00/11-13-27-27 W4M
Location Alias 2: 00/11-13-027-27 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 27
Section: 13
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 11-13-27-27
Operator Name: Ember Resources Inc.
License Number: 0321781
License Date: 2004-12-15
License Status: Issued
Spud Date: 2005-08-03
Final Drill Date: 2005-08-07
Well Total Depth: 834.00 m
Surface Hole Latitude: 51.310292
Surface Hole Longitude: -113.674036

For data sources see[1][2]

Well History

Date Event
2004-12-15 Obtained License
2005-08-04 Surface Casing Operation Performed
2005-08-07 Finished Drilling
2005-08-07 Production Casing Operation Performed
2005-08-07 Rig Released
2005-08-07 Well Mode changed to Drilled and Cased
2005-08-13 Well Log Performed
2005-09-05 Perforation Treatment Performed - Jet Perforation
2005-09-23 Well Fluid changed to Gas
2005-09-23 Well Mode changed to Testing
2005-10-16 Perforation Treatment Performed - Fractured
2005-11-18 Perforation Treatment Performed - Jet Perforation
2005-11-18 Well Fluid changed to Gas
2005-11-18 Well Mode changed to Test Completed
2005-11-20 Perforation Treatment Performed - Fractured
2005-11-26 Perforation Treatment Performed - Fractured
2017-04-05 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-09-05 Perforation 781.00 783.00 13
2005-11-18 Perforation 652.00 652.50 13
2005-11-18 Perforation 650.80 651.30 13
2005-11-18 Perforation 635.50 636.00 13
2005-11-18 Perforation 634.40 634.90 13
2005-11-18 Perforation 629.40 629.90 13
2005-11-18 Perforation 622.80 623.30 13
2005-11-18 Perforation 595.70 596.20 13
2005-11-18 Perforation 589.70 590.20 13
2005-11-18 Perforation 586.80 587.30 13
2005-11-18 Perforation 566.10 566.60 13
2005-10-16 Fracture 781.00 783.00 0
2005-11-18 Perforation 529.70 530.70 13
2005-11-18 Perforation 520.40 520.90 13
2005-11-18 Perforation 442.60 443.10 13
2005-11-18 Perforation 400.30 400.80 13
2005-11-18 Perforation 416.40 416.90 13
2005-11-18 Perforation 409.80 410.30 13
2005-11-18 Perforation 397.30 397.80 13
2005-11-18 Perforation 388.00 388.50 13
2005-11-18 Perforation 331.30 331.80 13
2005-11-18 Perforation 261.50 262.00 13
2005-11-18 Perforation 702.20 702.70 13
2005-11-20 Fracture 702.20 702.70 0
2005-11-26 Fracture 261.50 697.70 0
2005-11-18 Perforation 697.20 697.70 13
2005-11-18 Perforation 694.20 694.70 13
2005-11-18 Perforation 684.90 685.40 13
2005-11-18 Perforation 669.00 669.50 13
2005-11-18 Perforation 663.30 663.80 13
2005-11-18 Perforation 658.40 658.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 48 0.0 0.0 0.0

For data sources see[5]

References