X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284251901002

Well Details

Well ID: 0284251901002
Loading map...
Location: 00/01-19-028-25W4/2
Location Alias: 00/01-19-28-25 W4M
Location Alias 2: 00/01-19-028-25 W4/02
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 19
County/Municipality: Rocky View County
Well Name: EMBER 1B ENTICE 1-19-28-25
Operator Name: Ember Resources Inc.
License Number: 0228661
License Date: 1999-11-13
License Status: Issued
Spud Date: 1999-11-24
Final Drill Date: 1999-11-26
Well Total Depth: 1018.00 m
Surface Hole Latitude: 51.401867
Surface Hole Longitude: -113.500939

For data sources see[1][2]

Well History

Date Event
1999-11-13 Obtained License
1999-11-25 Surface Casing Operation Performed
1999-11-26 Finished Drilling
1999-11-26 Production Casing Operation Performed
1999-11-26 Rig Released
1999-11-26 Well Mode changed to Drilled and Cased
1999-12-14 Well Log Performed
2000-01-21 Perforation Treatment Performed - Jet Perforation
2000-01-25 Perforation Treatment Performed - Jet Perforation
2000-01-30 Perforation Treatment Performed - Jet Perforation
2000-02-15 Perforation Treatment Performed - Fractured
2004-03-08 Perforation Treatment Performed - Jet Perforation
2004-06-18 Well Fluid changed to Gas
2004-06-18 Well Mode changed to Testing
2004-08-26 Well Began Production
2004-08-26 Well Fluid changed to Gas
2004-08-26 Well Mode changed to Flowing
2004-12-04 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-01-21 Perforation 831.50 834.50 7
2004-03-08 Perforation 216.30 216.90 13
2004-03-08 Perforation 218.30 218.90 13
2004-03-08 Perforation 259.90 260.50 13
2004-03-08 Perforation 326.20 326.80 13
2004-03-08 Perforation 330.30 330.90 13
2004-03-08 Perforation 339.60 340.20 13
2004-03-08 Perforation 392.30 392.90 13
2004-03-08 Perforation 442.60 443.20 13
2004-03-08 Perforation 443.60 444.20 13
2004-03-08 Perforation 458.20 458.80 13
2000-01-25 Perforation 689.00 692.00 7
2004-03-08 Perforation 462.00 462.60 13
2004-03-08 Perforation 465.40 466.00 13
2004-03-08 Perforation 471.20 471.80 13
2004-03-08 Perforation 499.30 499.90 13
2004-03-08 Perforation 505.20 505.80 13
2004-03-08 Perforation 513.60 514.20 13
2004-03-08 Perforation 515.50 516.10 13
2004-03-08 Perforation 522.70 523.30 13
2004-03-08 Perforation 546.90 547.50 13
2004-03-08 Perforation 548.10 548.70 13
2000-01-25 Perforation 684.00 687.00 7
2004-03-08 Perforation 556.40 557.00 13
2004-03-08 Perforation 560.30 560.90 13
2004-03-08 Perforation 571.60 572.20 13
2004-03-08 Perforation 572.20 572.80 13
2004-03-08 Perforation 581.20 581.80 13
2004-03-08 Perforation 582.70 583.30 13
2004-03-08 Perforation 587.60 588.20 13
2004-03-08 Perforation 590.30 590.90 13
2004-03-08 Perforation 602.10 602.70 13
2004-03-08 Perforation 613.50 614.10 13
2000-01-30 Perforation 669.50 674.50 7
2004-03-08 Perforation 615.80 616.40 13
2000-02-15 Fracture 669.50 692.00 0
2004-03-08 Perforation 195.00 195.60 13
2004-03-08 Perforation 201.90 202.50 13
2004-03-08 Perforation 203.70 204.30 13
2004-03-08 Perforation 204.40 205.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 2314 0.0 0.0 0.0

For data sources see[5]

References