If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494273608000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.270389,"lon":-113.808616,"icon":""}]} |
Location: 00/08-36-049-27W4/0 | |
Location Alias: 00/08-36-49-27 W4M | |
Location Alias 2: 00/08-36-049-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 27 | |
Section: 36 | |
County/Municipality: Calmar | |
Well Name: TEXACO CALMAR NO. 5 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0001752 | |
License Date: 1950-07-17 | |
License Status: RecExempt | |
Spud Date: 1950-08-02 | |
Final Drill Date: 1950-08-30 | |
Well Total Depth: 1643.20 m | |
Surface Hole Latitude: 53.270389 | |
Surface Hole Longitude: -113.808616 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1950-07-17 | Obtained License |
1950-08-23 | Drill Stem Test Performed |
1950-08-26 | Drill Stem Test Performed |
1950-08-27 | Drill Stem Test Performed |
1950-08-28 | Drill Stem Test Performed |
1950-08-29 | Drill Stem Test Performed |
1950-08-30 | Finished Drilling |
1950-08-30 | Well Mode changed to Drilled and Cased |
1950-08-31 | Production Casing Operation Performed |
1950-09-03 | Perforation Treatment Performed - Bullet Perforation |
1950-09-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1950-09-08 | Perforation Treatment Performed - Cement Squeeze |
1950-09-12 | Perforation Treatment Performed - Bullet Perforation |
1950-09-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1950-09-16 | Perforation Treatment Performed - Cement Squeeze |
1950-09-16 | Perforation Treatment Performed - Jet Perforation |
1950-10-07 | Perforation Treatment Performed - Bullet Perforation |
1950-10-10 | Perforation Treatment Performed - Acid Wash - No Pressure |
1950-10-11 | Perforation Treatment Performed - Acid Wash - No Pressure |
1950-10-12 | Perforation Treatment Performed - Acid Wash - No Pressure |
1950-10-13 | Perforation Treatment Performed - Bullet Perforation |
1950-10-15 | Perforation Treatment Performed - Acid Wash - No Pressure |
1950-10-19 | Perforation Treatment Performed - Bullet Perforation |
1950-10-23 | Perforation Treatment Performed - Bullet Perforation |
1950-10-26 | Perforation Treatment Performed - Acid Wash - No Pressure |
1950-10-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1950-11-15 | Well Began Production |
1950-11-15 | Well Fluid changed to Crude Oil |
1950-11-15 | Well Mode changed to Pumping |
1953-04-27 | Perforation Treatment Performed - Jet Perforation |
1954-10-22 | Perforation Treatment Performed - Cement Plug |
1954-10-23 | Drill Stem Test Performed |
1954-10-23 | Perforation Treatment Performed - Bullet Perforation |
1954-10-30 | Perforation Treatment Performed - Cement Plug |
1954-11-11 | Well Abandoned |
1954-11-11 | Well Fluid changed to Crude Oil |
1954-11-11 | Well Mode changed to Abandoned |
2008-07-22 | Production Casing Operation Performed |
2008-12-16 | Well Log Performed |
2009-07-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-07-22 | Plug Back Performed |
2009-07-22 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1950-09-03 | Bullet Perforation | 1592.90 | 1597.20 | 10 |
1950-10-11 | Acid Wash | 1597.80 | 1598.70 | 0 |
1950-10-12 | Acid Wash | 1597.80 | 1598.70 | 0 |
1950-10-13 | Bullet Perforation | 1597.50 | 1598.10 | 16 |
1950-10-15 | Acid Wash | 1597.50 | 1598.70 | 0 |
1950-10-19 | Bullet Perforation | 1596.20 | 1596.50 | 13 |
1950-10-23 | Bullet Perforation | 1592.00 | 1595.30 | 10 |
1950-10-26 | Acid Wash | 1592.00 | 1595.30 | 0 |
1950-10-27 | Acid Treatment | 1592.00 | 1598.70 | 0 |
1953-04-27 | Perforation | 1594.10 | 1597.20 | 13 |
1954-10-22 | Cement Plug | 1577.90 | 1602.60 | 0 |
1950-09-05 | Acid Treatment | 1592.90 | 1597.20 | 0 |
1954-10-23 | Bullet Perforation | 1337.80 | 1339.60 | 13 |
1954-10-30 | Cement Plug | 1321.30 | 1344.20 | 0 |
2009-07-22 | Packing Device Capped w/Cement | 607.00 | 615.00 | 0 |
1950-09-08 | Cement Squeeze | 1592.90 | 1597.20 | 0 |
1950-09-12 | Bullet Perforation | 1592.00 | 1595.60 | 10 |
1950-09-14 | Acid Treatment | 1592.00 | 1595.60 | 0 |
1950-09-16 | Perforation | 1600.80 | 1601.10 | 10 |
1950-09-16 | Cement Squeeze | 1600.80 | 1601.10 | 0 |
1950-10-07 | Bullet Perforation | 1597.80 | 1598.70 | 10 |
1950-10-10 | Acid Wash | 1597.80 | 1598.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]