If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0305031916000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.589319,"lon":-114.402449,"icon":""}]} |
Location: 00/16-19-030-03W5/0 | |
Location Alias: 00/16-19-30-03 W5M | |
Location Alias 2: 00/16-19-030-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 5 | |
Range: 03 | |
Section: 19 | |
County/Municipality: Mountain View County | |
Well Name: ENERPLUS CROSSFIELD 16-19-30-3 | |
Operator Name: Enerplus Corporation | |
License Number: 0023037 | |
License Date: 1962-09-20 | |
License Status: RecCertified | |
Spud Date: 1962-09-21 | |
Final Drill Date: 1962-10-11 | |
Well Total Depth: 2151.00 m | |
Surface Hole Latitude: 51.589319 | |
Surface Hole Longitude: -114.402449 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1962-09-20 | Obtained License |
1962-10-11 | Finished Drilling |
1962-10-11 | Production Casing Operation Performed |
1962-10-11 | Well Mode changed to Drilled and Cased |
1962-10-13 | Perforation Treatment Performed - Jet Perforation |
1962-10-15 | Perforation Treatment Performed - Fractured |
1962-11-14 | Well Began Production |
1962-11-14 | Well Fluid changed to Crude Oil |
1962-11-14 | Well Mode changed to Pumping |
1971-07-19 | Well Began Injection |
1971-07-19 | Well Fluid changed to Water |
1971-07-19 | Well Type changed to Injection |
1973-12-01 | Well Fluid changed to Water |
1973-12-01 | Well Mode changed to Suspended |
1973-12-01 | Well Type changed to Injection |
1992-09-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-09-08 | Perforation Treatment Performed - Jet Perforation |
1992-09-08 | Plug Back Performed |
1992-09-09 | Perforation Treatment Performed - Remedial Casing |
1992-09-09 | Well Fluid changed to Water |
1992-09-09 | Well Mode changed to Abandoned |
1992-09-09 | Well Type changed to Injection |
1992-10-23 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1962-10-13 | Perforation | 2132.10 | 2133.90 | 7 |
1962-10-15 | Fracture | 2132.10 | 2133.90 | 0 |
1992-09-08 | Packing Device Capped w/Cement | 1987.00 | 1995.00 | 0 |
1992-09-08 | Perforation | 620.00 | 621.00 | 13 |
1992-09-09 | Remedial Casing Cementing | 620.00 | 621.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 744 | 0.0 | 0.0 | 0.0 |
1968 | 7295 | 0.0 | 0.0 | 0.0 |
1969 | 8711 | 0.0 | 0.0 | 0.0 |
1970 | 840 | 0.0 | 0.0 | 0.0 |
1971 | 1008 | 0.0 | 0.0 | 0.0 |
1972 | 0 | 0.0 | 0.0 | 0.0 |
1973 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]