X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334170506020

Well Details

Well ID: 0334170506020
Loading map...
Location: 02/06-05-033-17W4/0
Location Alias: 02/06-05-33-17 W4M
Location Alias 2: 02/06-05-033-17 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 17
Section: 05
County/Municipality: Starland County
Well Name: TEAC CHAIN 6-5-33-17
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0354834
License Date: 2006-03-29
License Status: Issued
Spud Date: 2006-06-29
Final Drill Date: 2006-06-29
Well Total Depth: 351.00 m
Surface Hole Latitude: 51.800448
Surface Hole Longitude: -112.382710

For data sources see[1][2]

Well History

Date Event
2006-03-29 Obtained License
2006-06-06 Surface Casing Operation Performed
2006-06-29 Finished Drilling
2006-06-29 Well Mode changed to Drilled and Cased
2006-06-30 Production Casing Operation Performed
2006-06-30 Rig Released
2006-07-10 Well Log Performed
2006-08-30 Perforation Treatment Performed - Jet Perforation
2006-08-30 Well Log Performed
2006-09-07 Perforation Treatment Performed - Fractured
2006-11-03 Well Began Production
2006-11-03 Well Fluid changed to Coalbed Methane-Coals and Other
2006-11-03 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-08-30 Perforation 317.20 318.20 7
2006-08-30 Perforation 158.50 160.00 7
2006-08-30 Perforation 153.80 154.80 7
2006-08-30 Perforation 150.40 150.90 13
2006-08-30 Perforation 147.90 149.40 7
2006-08-30 Perforation 142.70 143.70 7
2006-08-30 Perforation 141.20 142.20 7
2006-08-30 Perforation 133.20 134.70 7
2006-08-30 Perforation 124.00 124.50 13
2006-08-30 Perforation 112.50 113.50 7
2006-08-30 Perforation 109.40 109.90 13
2006-08-30 Perforation 283.50 284.00 13
2006-08-30 Perforation 104.90 105.90 7
2006-08-30 Perforation 99.00 99.50 13
2006-08-30 Perforation 90.70 93.20 7
2006-09-07 Fracture 317.20 318.20 0
2006-09-07 Fracture 283.50 284.00 0
2006-09-07 Fracture 259.90 260.90 0
2006-09-07 Fracture 253.70 255.20 0
2006-09-07 Fracture 248.60 250.60 0
2006-09-07 Fracture 215.00 218.00 0
2006-09-07 Fracture 212.50 214.00 0
2006-08-30 Perforation 259.90 260.90 7
2006-09-07 Fracture 195.70 196.20 0
2006-09-07 Fracture 161.20 161.70 0
2006-09-07 Fracture 158.50 160.00 0
2006-09-07 Fracture 153.80 154.80 0
2006-09-07 Fracture 147.90 150.90 0
2006-09-07 Fracture 141.20 143.70 0
2006-09-07 Fracture 133.20 134.70 0
2006-09-07 Fracture 124.00 124.50 0
2006-09-07 Fracture 112.50 113.50 0
2006-09-07 Fracture 109.40 109.90 0
2006-08-30 Perforation 253.70 255.20 7
2006-09-07 Fracture 104.90 105.90 0
2006-09-07 Fracture 99.00 99.50 0
2006-09-07 Fracture 90.70 93.20 0
2006-08-30 Perforation 248.60 250.60 7
2006-08-30 Perforation 215.00 218.00 7
2006-08-30 Perforation 212.50 214.00 7
2006-08-30 Perforation 195.70 196.20 13
2006-08-30 Perforation 161.20 161.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 1129 0.0 0.0 0.0
2007 8689 0.0 0.0 0.0
2008 8664 0.0 0.0 0.0
2009 8585 0.0 0.0 0.0
2010 8729 0.0 0.0 0.0
2011 8626 0.0 0.0 0.0
2012 8636 0.0 0.0 0.0
2013 8635 0.0 0.0 0.0
2014 8656 0.0 0.0 0.0
2015 8171 0.0 0.0 0.0
2016 8670 0.0 0.0 0.0
2017 8711 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 2879 0.0 0.0 0.0

For data sources see[5]

References