X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334170908000

Well Details

Well ID: 0334170908000
Loading map...
Location: 00/08-09-033-17W4/0
Location Alias: 00/08-09-33-17 W4M
Location Alias 2: 00/08-09-033-17 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 17
Section: 09
County/Municipality: Starland County
Well Name: TEAC CHAIN 8-9-33-17
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0352033
License Date: 2006-02-14
License Status: Issued
Spud Date: 2006-07-12
Final Drill Date: 2006-07-12
Well Total Depth: 377.00 m
Surface Hole Latitude: 51.815793
Surface Hole Longitude: -112.347603

For data sources see[1][2]

Well History

Date Event
2006-02-14 Obtained License
2006-07-01 Surface Casing Operation Performed
2006-07-12 Finished Drilling
2006-07-12 Production Casing Operation Performed
2006-07-12 Rig Released
2006-07-12 Well Mode changed to Drilled and Cased
2006-07-22 Well Log Performed
2006-08-31 Perforation Treatment Performed - Jet Perforation
2006-08-31 Well Log Performed
2006-09-12 Perforation Treatment Performed - Fractured
2006-10-20 Well Began Production
2006-10-20 Well Fluid changed to Coalbed Methane-Coals and Other
2006-10-20 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-08-31 Perforation 264.50 265.50 7
2006-08-31 Perforation 160.30 161.80 7
2006-08-31 Perforation 156.00 158.00 7
2006-08-31 Perforation 153.60 154.10 13
2006-08-31 Perforation 149.50 152.00 7
2006-08-31 Perforation 148.20 148.70 13
2006-08-31 Perforation 143.90 145.40 7
2006-08-31 Perforation 137.40 137.90 13
2006-08-31 Perforation 121.10 121.60 13
2006-08-31 Perforation 117.50 118.50 7
2006-08-31 Perforation 113.60 114.60 7
2006-08-31 Perforation 257.90 259.40 7
2006-08-31 Perforation 100.70 101.70 7
2006-08-31 Perforation 96.40 96.90 13
2006-08-31 Perforation 91.00 91.50 13
2006-09-12 Fracture 264.50 265.50 0
2006-09-12 Fracture 257.90 259.40 0
2006-09-12 Fracture 250.50 251.00 0
2006-09-12 Fracture 223.00 223.50 0
2006-09-12 Fracture 207.60 208.10 0
2006-09-12 Fracture 179.70 180.70 0
2006-09-12 Fracture 177.00 178.00 0
2006-08-31 Perforation 250.50 251.00 13
2006-09-12 Fracture 165.00 168.60 0
2006-09-12 Fracture 160.30 161.80 0
2006-09-12 Fracture 156.00 158.00 0
2006-09-12 Fracture 149.50 154.10 0
2006-09-12 Fracture 143.90 148.70 0
2006-09-12 Fracture 137.40 137.90 0
2006-09-12 Fracture 121.10 121.60 0
2006-09-12 Fracture 117.50 118.50 0
2006-09-12 Fracture 113.60 114.60 0
2006-09-12 Fracture 100.70 101.70 0
2006-08-31 Perforation 223.00 223.50 13
2006-09-12 Fracture 96.40 96.90 0
2006-09-12 Fracture 91.00 91.50 0
2006-08-31 Perforation 207.60 208.10 13
2006-08-31 Perforation 179.70 180.70 7
2006-08-31 Perforation 177.00 178.00 7
2006-08-31 Perforation 167.10 168.60 7
2006-08-31 Perforation 165.00 166.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 1656 0.0 0.0 0.0
2007 8692 0.0 0.0 0.0
2008 8664 0.0 0.0 0.0
2009 8584 0.0 0.0 0.0
2010 8725 0.0 0.0 0.0
2011 8626 0.0 0.0 0.0
2012 8636 0.0 0.0 0.0
2013 8635 0.0 0.0 0.0
2014 8656 0.0 0.0 0.0
2015 8053 0.0 0.0 0.0
2016 8670 0.0 0.0 0.0
2017 8711 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 2879 0.0 0.0 0.0

For data sources see[5]

References