If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354090107000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.972283,"lon":-111.153991,"icon":""}]} |
Location: 00/07-01-035-09W4/0 | |
Location Alias: 00/07-01-35-09 W4M | |
Location Alias 2: 00/07-01-035-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 09 | |
Section: 01 | |
County/Municipality: Special Areas No. 4 | |
Well Name: ENERPLUS ET AL PROVOST 7-1-35-9 | |
Operator Name: Enerplus Corporation | |
License Number: 0037195 | |
License Date: 1969-11-12 | |
License Status: RecCertified | |
Spud Date: 1969-11-14 | |
Final Drill Date: 1969-11-17 | |
Well Total Depth: 922.00 m | |
Surface Hole Latitude: 51.972283 | |
Surface Hole Longitude: -111.153991 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1969-11-12 | Obtained License |
1969-11-17 | Finished Drilling |
1969-11-17 | Production Casing Operation Performed |
1969-11-17 | Well Mode changed to Drilled and Cased |
1969-11-29 | Perforation Treatment Performed - Jet Perforation |
1969-11-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1970-02-15 | Well Began Injection |
1970-02-15 | Well Fluid changed to Water |
1970-02-15 | Well Type changed to Injection |
1989-01-01 | Well Fluid changed to Water |
1989-01-01 | Well Mode changed to Suspended |
1989-01-01 | Well Type changed to Injection |
1993-10-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-10-13 | Perforation Treatment Performed - Jet Perforation |
1993-10-13 | Perforation Treatment Performed - Remedial Casing |
1993-10-13 | Plug Back Performed |
1993-10-13 | Well Abandoned |
1993-10-13 | Well Fluid changed to Water |
1993-10-13 | Well Mode changed to Abandoned |
1993-10-13 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1969-11-29 | Perforation | 908.60 | 910.10 | 7 |
1969-11-30 | Acid Treatment | 908.60 | 910.10 | 0 |
1993-10-13 | Packing Device Capped w/Cement | 885.60 | 893.60 | 0 |
1993-10-13 | Perforation | 353.50 | 354.50 | 14 |
1993-10-13 | Remedial Casing Cementing | 353.50 | 354.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1970 | 0 | 0.0 | 0.0 | 0.0 |
1971 | 0 | 0.0 | 0.0 | 0.0 |
1972 | 0 | 0.0 | 0.0 | 0.0 |
1973 | 0 | 0.0 | 0.0 | 0.0 |
1974 | 0 | 0.0 | 0.0 | 0.0 |
1975 | 0 | 0.0 | 0.0 | 0.0 |
1976 | 0 | 0.0 | 0.0 | 0.0 |
1977 | 0 | 0.0 | 0.0 | 0.0 |
1978 | 0 | 0.0 | 0.0 | 0.0 |
1979 | 0 | 0.0 | 0.0 | 0.0 |
1980 | 0 | 0.0 | 0.0 | 0.0 |
1981 | 0 | 0.0 | 0.0 | 0.0 |
1982 | 0 | 0.0 | 0.0 | 0.0 |
1983 | 0 | 0.0 | 0.0 | 0.0 |
1984 | 0 | 0.0 | 0.0 | 0.0 |
1985 | 0 | 0.0 | 0.0 | 0.0 |
1986 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]