If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 31-037-26071 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.961177999,"lon":-77.98505699,"icon":""}]} |
Well Name: Fee 5 | |
Country: United States | |
State: New York | |
County: Genesee | |
Municipality: Le Roy | |
Operator Name: Le Roy Central School | |
Well Status: Active | |
Spud Date: 2008-07-30 | |
Permit Date: 2008-05-08 | |
Well Completion Date: 2008-08-29 | |
Configuration: Vertical | |
Measured Well Depth (ft): 1477 | |
Latitude: 42.961177999 | |
Longitude: -77.98505699 |
For data sources see[1]
Period | Operator Name | Fluid Type | Fluid Quantity | Fluid Production Time |
---|---|---|---|---|
2008 | Le Roy Central School | GAS | 0 Mcf | 0 Months |
2009 | Le Roy Central School | GAS | 10 Mcf | 12 Months |
2010 | Le Roy Central School | GAS | 7 Mcf | 12 Months |
2010 | Le Roy Central School | OIL | 0 Bbl | 12 Months |
2011 | Le Roy Central School | GAS | 5 Mcf | 12 Months |
2011 | Le Roy Central School | OIL | 0 Bbl | 12 Months |
2012 | Le Roy Central School | GAS | 1761 Mcf | 12 Months |
2012 | Le Roy Central School | OIL | 0 Bbl | 12 Months |
2013 | Le Roy Central School | GAS | 978 Mcf | 12 Months |
2013 | Le Roy Central School | OIL | 0 Bbl | 12 Months |
2014 | Le Roy Central School | GAS | 879 Mcf | 12 Months |
2014 | Le Roy Central School | OIL | 0 Bbl | 12 Months |
2015 | Le Roy Central School | GAS | 774 Mcf | 12 Months |
2015 | Le Roy Central School | OIL | 0 Bbl | 12 Months |
2016 | Le Roy Central School | GAS | 570 Mcf | 5 Months |
2016 | Le Roy Central School | OIL | 0 Bbl | 5 Months |
2017 | Le Roy Central School | GAS | 1430 Mcf | 12 Months |
2017 | Le Roy Central School | OIL | 0 Bbl | 12 Months |
2018 | Le Roy Central School | GAS | 2780 Mcf | 12 Months |
2018 | Le Roy Central School | OIL | 0 Bbl | 12 Months |
For data sources see[2]
Period | Operator | Waste Type | Quantity | Time Produced |
---|---|---|---|---|
2008 | Le Roy Central School | WATER | 0 Bbl | 0 Months |
2009 | Le Roy Central School | WATER | 0 Bbl | 12 Months |
2010 | Le Roy Central School | WATER | 0 Bbl | 12 Months |
2011 | Le Roy Central School | WATER | 21 Bbl | 12 Months |
2012 | Le Roy Central School | WATER | 36 Bbl | 12 Months |
2013 | Le Roy Central School | WATER | 36 Bbl | 12 Months |
2014 | Le Roy Central School | WATER | 0 Bbl | 12 Months |
2015 | Le Roy Central School | WATER | 11 Bbl | 12 Months |
2016 | Le Roy Central School | WATER | 17 Bbl | 5 Months |
2017 | Le Roy Central School | WATER | 0 Bbl | 12 Months |
2018 | Le Roy Central School | WATER | 17 Bbl | 12 Months |
For data sources see[2]
Event Date | Event Description |
---|---|
2008-05-08 | New Permit Issued. |
For data sources see[1]