X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

31-029-25916

Well Details

Well ID: 31-029-25916
Loading map...
Well Name: Pitkin 4
Country: United States
State: New York
County: Erie
Municipality: Wales
Operator Name: PPP Future Development Inc.
Well Status: Active
Spud Date: 2009-03-31
Permit Date: 2009-03-11
Well Completion Date: 2013-01-30
Configuration: Vertical
Measured Well Depth (ft): 2229
Latitude: 42.714333000
Longitude: -78.46716399

For data sources see[1]

Production Data

Period Operator Name Fluid Type Fluid Quantity Fluid Production Time
2010 PPP Future Development Inc. Gas 83.00 Mcf 10 Months
2010 PPP Future Development Inc. Oil 0.00 Bbl 10 Months
2011 PPP Future Development Inc. Gas 108.00 Mcf 11 Months
2011 PPP Future Development Inc. Oil 0.00 Bbl 11 Months
2012 PPP Future Development Inc. Gas 331.00 Mcf 4 Months
2012 PPP Future Development Inc. Oil 0.00 Bbl 4 Months
2013 PPP Future Development Inc. Gas 2101.00 Mcf 12 Months
2013 PPP Future Development Inc. Oil 0.00 Bbl 12 Months
2014 PPP Future Development Inc. Gas 907.00 Mcf 12 Months
2014 PPP Future Development Inc. Oil 0.00 Bbl 12 Months
2015 PPP Future Development Inc. Gas 891.00 Mcf 6 Months
2015 PPP Future Development Inc. Oil 0.00 Bbl 6 Months
2016 PPP Future Development Inc. Gas 724.00 Mcf 4 Months
2016 PPP Future Development Inc. Oil 0.00 Bbl 4 Months
2017 PPP Future Development Inc. Gas 19.00 Mcf 1 Months
2017 PPP Future Development Inc. Oil 0.00 Bbl 1 Months
2018 PPP Future Development Inc. Gas 131.00 Mcf 6 Months
2018 PPP Future Development Inc. Oil 0.00 Bbl 6 Months
2019 PPP Future Development Inc. Gas 197.00 Mcf 8 Months
2019 PPP Future Development Inc. Oil 0.00 Bbl 8 Months

For data sources see[2][3]

Waste Data

Period Operator Name Waste Type Waste Quantity Time Produced
2010 PPP Future Development Inc. WATER 100 Bbl 10 Months
2011 PPP Future Development Inc. WATER 0 Bbl 11 Months
2012 PPP Future Development Inc. WATER 0 Bbl 4 Months
2013 PPP Future Development Inc. WATER 4568 Bbl 12 Months
2014 PPP Future Development Inc. WATER 1430 Bbl 12 Months
2015 PPP Future Development Inc. WATER 40 Bbl 6 Months
2016 PPP Future Development Inc. WATER 0 Bbl 4 Months
2017 PPP Future Development Inc. WATER 0 Bbl 1 Months
2018 PPP Future Development Inc. WATER 0 Bbl 6 Months
2019 PPP Future Development Inc. WATER 0 Bbl Unknown

For data sources see[2][3]

Well History

Event Date Event Description
2009-03-11 New Permit Issued.
2009-03-31 Drilling started
2013-01-30 Drilling completed

For data sources see[2][4]

Owner History

Effective Date Old Operator Name New Operator Name
2018-01-18 U. S. Energy Development Corporation PPP Future Development Inc.

For data sources see[5]

References

  1. "Public Wells Data". New York State Department of Environmental Conservation. 2019-08-09. Retrieved 2019-08-09. 
  2. 2.0 2.1 2.2 "New York Data Sources". New York. 2021-06-21. Retrieved 2021-06-21. 
  3. 3.0 3.1 "NYDEC State Well Production Data starting 2001". New York State Department of Environmental Conservation. 2021-06-21. Retrieved 2021-06-21. 
  4. "NYDEC State Wells Data". New York State Department of Environmental Conservation. 2021-06-21. Retrieved 2021-06-21. 
  5. "NY Well Transfer Owner". New York State Department of Environmental Conservation. 2021-06-21. Retrieved 2021-06-21.