X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

31-011-06779

Well Details

Well ID: 31-011-06779
Loading map...
Well Name: Karim 1
Country: United States
State: New York
County: Cayuga
Municipality: Cato
Operator Name: Karim Raja Abdul
Well Status: Unknown Located
Spud Date: 1968-02-02
Permit Date: 1969-01-21
Well Completion Date: 1969-07-15
Configuration: Vertical
Measured Well Depth (ft): 3128
Latitude: 43.108848000
Longitude: -76.56168800

For data sources see[1]

Production Data

Period Operator Name Fluid Type Fluid Quantity Fluid Production Time
1985 Karim Raja Abdul Gas 0.00 Mcf 0 Months
1986 Karim Raja Abdul Gas 0.00 Mcf 0 Months
1989 Karim Raja Abdul Gas 0.00 Mcf 1 Months
1990 Karim Raja Abdul Gas 1.00 Mcf 1 Months
1991 Karim Raja Abdul Gas 1.00 Mcf 1 Months
1992 Karim Raja Abdul Gas 1.00 Mcf 1 Months
1993 Karim Raja Abdul Gas 1.00 Mcf 1 Months
1994 Karim Raja Abdul Gas 1.00 Mcf 12 Months
1995 Karim Raja Abdul Gas 1.00 Mcf 12 Months
1996 Karim Raja Abdul Gas 1.00 Mcf 12 Months
1997 Karim Raja Abdul Gas 1.00 Mcf 12 Months
1998 Karim Raja Abdul Gas 0.00 Mcf 12 Months
1999 Karim Raja Abdul Gas 1.00 Mcf 12 Months
2000 Karim Raja Abdul Gas 1.00 Mcf 12 Months
2002 Karim Raja Abdul Gas 1.00 Mcf 12 Months
2002 Karim Raja Abdul Oil 0.00 Bbl 12 Months

For data sources see[2]

Waste Data

Period Operator Name Waste Type Waste Quantity Time Produced
1985 Karim Raja Abdul WATER 0 Bbl 0 Months
1986 Karim Raja Abdul WATER 0 Bbl 0 Months
1989 Karim Raja Abdul WATER 0 Bbl 1 Months
1990 Karim Raja Abdul WATER 0 Bbl 1 Months
1991 Karim Raja Abdul WATER 0 Bbl 1 Months
1992 Karim Raja Abdul WATER 0 Bbl 1 Months
1993 Karim Raja Abdul WATER 0 Bbl 1 Months
1994 Karim Raja Abdul WATER 0 Bbl 12 Months
1995 Karim Raja Abdul WATER 0 Bbl 12 Months
1996 Karim Raja Abdul WATER 0 Bbl 12 Months
1997 Karim Raja Abdul WATER 0 Bbl 12 Months
1998 Karim Raja Abdul WATER 0 Bbl 12 Months
1999 Karim Raja Abdul WATER 0 Bbl 12 Months
2002 Karim Raja Abdul WATER 0 Bbl 12 Months

For data sources see[2]

Well History

Event Date Event Description
1968-02-02 Drilling started
1969-01-21 New Permit Issued.
1969-07-15 Drilling completed

For data sources see[3][2]

References

  1. "Public Wells Data". New York State Department of Environmental Conservation. 2019-08-09. Retrieved 2019-08-09. 
  2. 2.0 2.1 2.2 "New York Data Sources". New York. 2021-06-21. Retrieved 2021-06-21. 
  3. "NYDEC State Wells Data". New York State Department of Environmental Conservation. 2021-06-21. Retrieved 2021-06-21.